El Paso Solar
Permit Design.
Not ERCOT. EPE Western Grid.
Approval Before You Install.
El Paso solar permit drawings for City of El Paso and all El Paso County AHJs. El Paso Electric is NOT in ERCOT — no REP selection, net metering instead of buyback plans. EPE’s July 2025 rate case imposed a 10% export cap on new installations. And EPE requires written design approval before any installation begins. 297 sunny days. Free for first-time clients.
No REP Selection. And EPE’s July 2025 Rate Case Changed Export Rules for New Installations.
Installers who work El Paso alongside ERCOT cities make two mistakes: they tell customers to pick a solar buyback REP (an ERCOT concept that doesn’t apply here), and they miss the July 2025 EPE rate case changes. El Paso Electric is a regulated IOU on the Western Interconnection — it handles generation, delivery, and interconnection as one entity. No REP. No ERCOT market. A completely different structure from Dallas, Houston, or Austin.
Wrong Plan Set Format for EPE. Oversized Systems Past the 10% Cap. Installing Before Approval.
EPE-Formatted. NEC 2020. Export Cap Sized. All El Paso County AHJs.
Four Things That Define Solar in Sun City.
City of El Paso and All El Paso County Jurisdictions — EPE Formatted. Approval-Before-Install Workflow.
We cover City of El Paso, El Paso County, and surrounding communities including the New Mexico side of EPE territory.
| Jurisdiction | Utility | Permit Portal | Key Notes | Review Time |
|---|---|---|---|---|
| City of El Paso | EPE | El Paso Dev. Services | EPE approval before install · $85 fee ≤10kW · NEC 2020 · 10% export cap post-July 2025 | 1–3 weeks |
| El Paso County (unincorp.) | EPE | County Building | County Building Department · EPE territory · Confirm AHJ per address | 2–4 weeks |
| Socorro / Horizon City | EPE | City portal | East El Paso communities · EPE territory · Growing residential solar | 2–3 weeks |
| Anthony (TX side) | EPE | City / County | TX/NM border · EPE serves both sides · Confirm state jurisdiction per address | 2–4 weeks |
| Sunland Park (NM) | EPE (NM) | NM State AHJ | New Mexico permitting · EPE NM interconnection · Different NM net metering rules | 3–5 weeks |
| Las Cruces area (NM) | EPE (NM) | NM City / County | Southern NM EPE territory · NM PRC governs · Different from TX rate rules | 3–5 weeks |
| Fort Bliss | EPE / Federal | Federal permitting | Military installation · Federal project permitting · EPE interconnection | Varies |
References: EPE Texas Interconnection · El Paso Development Services
Solar Permit Package El Paso — El Paso Solar Permit Plan Sets. EPE-Ready. Export Cap Documented.
El Paso Plan Set — 24 Hours.
EPE-Formatted · NEC 2020 · Export Cap Documentation · All El Paso County AHJs
Three Steps. EPE Approval First. City Permit Second.
Licensed installers & EPCs only.