Austin Solar
Permit Design.
Austin Energy VOS.
Not Net Metering. Know the Difference.

Austin solar permit drawings and PE-stamped plan sets for City of Austin and all Travis County AHJs. Austin Energy's Value of Solar tariff pays for ALL generation at 9.91¢/kWh — not just exports. Most solar proposals in Austin get this wrong. We get it right. Residential, commercial, battery, EV charger. Free for first-time clients.

150+ installer partners
·
Austin Energy VOS formatted
·
NEC 2020 · Austin DSD
·
Free AHJ revisions
9.91¢Austin Energy VOS rate (2026) — paid on ALL generation
NEC 2020Texas working electrical standard · No NEC 2026 yet
100%Texas property tax exemption on solar added value
24–48 hrStandard residential plan set delivery
2026 Codes Electrical: NEC 2020 (Texas working standard) Structural: IBC 2021 / IRC 2021 Utility: Austin Energy VOS 9.91¢/kWh · Not ERCOT deregulated Federal credit: 25D expired Dec 31, 2025 — not available in 2026 Last verified July 2026
The Austin Energy Difference

Austin Energy's Value of Solar Is Not Net Metering. It Credits ALL Generation — Not Just What You Export. Most Solar Proposals in Austin Get This Wrong.

In most of California and in other Texas cities, solar economics depend on what you export to the grid. Austin Energy is different. The Value of Solar (VOS) tariff credits every kilowatt-hour your system generates — whether it's consumed on-site or exported — at a fixed rate. Austin Energy then charges you separately for every kilowatt-hour you pull from the grid at retail rates. Understanding this structure is essential to sizing Austin solar correctly.

9.91¢ Per kWh · ALL generation · 2026 rate

Austin Energy Value of Solar Tariff — How It Actually Works

Your solar meter measures total kilowatt-hours generated — not net exports. Austin Energy credits that total at 9.91¢/kWh. Separately, your service meter measures all grid imports, charged at retail (~12¢/kWh). You pay retail for everything you pull; you get 9.91¢ for everything your panels produce, regardless of self-consumption. This is not net metering. Austin Energy requires a dedicated production meter alongside the service meter, which affects plan set format and interconnection application.

⚠️ Austin Energy requires advanced inverter settings under Rule 25. Inverters must support volt-VAR optimization, volt-Watt response, and frequency-watt response modes. Not all inverter firmware versions meet this requirement out of the box. Permit Design confirms inverter model and firmware compliance with Austin Energy Rule 25 before submitting interconnection documentation.
Why Austin Installers Outsource

VOS Misrepresentation. No Federal Credit in 2026. Austin Energy's Inverter Requirements. Three Things That Trip Up Austin Solar Projects.

Quoting Austin Energy as Net Metering Produces Wrong Customer Expectations
National solar proposal tools model net metering — credits only for excess exports at retail. Austin Energy's VOS credits ALL generation at 9.91¢/kWh. An Austin customer quoted on a net metering model will see different bill savings than projected — and you'll explain the discrepancy. We format plan sets and interconnection documentation for Austin Energy VOS specifically.
💰
The Federal Solar Tax Credit Expired December 31, 2025 — Austin Customers Need to Know
The federal Section 25D credit (30%) expired December 31, 2025 — not renewed. For 2026 installations, there is no federal tax credit. Texas still has a 100% property tax exemption on solar added value and a sales tax exemption on solar equipment. Austin Energy's $2,500 rebate may still be available depending on program funding.
📐
Austin Energy Rule 25 Requires Advanced Inverter Settings That Many Out-of-State Firms Miss
Austin Energy Rule 25 requires inverters to support volt-VAR, volt-Watt, and frequency-watt response modes. An interconnection application with a non-compliant inverter gets rejected — and firmware updates can take weeks. We check inverter model and firmware compatibility before building the plan set.
Austin Solar Permit Services

VOS-Formatted. NEC 2020. Austin DSD. All Travis County AHJs.

🏠
Austin Residential Solar Permit Design
NEC 2020, IBC/IRC 2021. Austin Energy VOS tariff documentation — production meter configuration, advanced inverter Rule 25 compliance. Austin DSD permit formatted. No PE stamp required for standard residential. Battery (NEC 2020 Article 706) where included.
NEC 2020VOS FormattedRule 25
Residential Solar Permit Design Services →
🏗️
Austin Commercial Solar Permit Design
Commercial rooftop and carport permit drawings for Travis County. IBC 2021, NEC 2020. Austin Energy commercial interconnection. Austin's tech campus and government building sector creates a large commercial solar market — flat rooftop, TPO, and carport configurations covered. PE stamp where project size requires it.
IBC 2021Tech CampusAustin Energy
Commercial Solar Permit Design Services →
🔋
Austin Battery Permit Plans
Solar-paired and standalone battery permit drawings. NEC 2020 Article 706, Austin Energy storage interconnection. Austin Energy's VOS tariff already credits all generation — battery adds resilience during Texas ERCOT grid events and CREZ wind curtailment periods that can spike retail rates.
NEC 2020 Art.706Grid ResilienceAE Storage
Battery Storage Permit Design Services →
🚗
Austin EV Charger Permit Design
EV charger permit drawings for Travis County residential and commercial. NEC 2020 Article 625, load calculations, panel upgrade integration. Austin's tech workforce and university demographics drive among the highest EV adoption rates in Texas. Solar + battery + EV is a strong package for Austin homeowners.
NEC 2020 Art.625Level 2Load Calcs
EV Charger Permit Design Services →
Austin Solar Market — 2026

Four Things Shaping Austin Solar Right Now.

9.91¢
Austin Energy VOS — Pays on ALL Generation, Not Just Exports
Austin Energy's VOS tariff pays 9.91¢/kWh on all generation in 2026. Unlike net metering — which only credits excess exports — VOS credits every panel-generated kilowatt-hour. The key planning question for Austin is annual generation vs retail cost avoidance — not export volume.
$0
Federal 25D Credit — Expired December 31, 2025
The federal Section 25D credit is gone for 2026 — expired December 31, 2025. The conversation shifts to Texas incentives: 100% property tax exemption on solar added value, sales tax exemption on equipment and labor, and Austin Energy's $2,500 rebate where available.
100%
Texas Property Tax Exemption on Solar Added Value — Active in 2026
Texas exempts 100% of solar added home value from property taxes — permanent and uncapped. A system adding $15,000 to assessed value generates zero additional property tax. Combined with the sales tax exemption on equipment and labor, Texas maintains strong solar economics even without the federal credit.
Rule 25
Austin Energy Advanced Inverter Requirement — Stricter Than Other Texas Utilities
Austin Energy Rule 25 requires volt-VAR optimization, volt-Watt response, and frequency-watt response capability. Most modern inverters support these modes, but firmware version matters — some models need updates. Permit Design confirms compatibility before submitting Austin Energy interconnection documentation.
AHJ Solar Permit Design Austin

City of Austin DSD and All Travis County Jurisdictions — VOS Documented Every Time.

We cover City of Austin, Travis County, and all surrounding cities. AHJ confirmed per address, Austin Energy Rule 25 compliance verified before we build.

JurisdictionUtilityPermit PortalKey NotesReview Time
City of AustinAustin EnergyAustin DSD ePlanVOS tariff · Rule 25 inverter · $200–400 fee · Fast-track green energy permits5–10 business days
Travis County (unincorp.)Austin EnergyTravis County TRAKiTAustin Energy service area extends into county · Confirm AHJ per address1–3 weeks
Cedar ParkAustin Energy / OncorCity of Cedar ParkMixed utility territory — confirm per address · Williamson County line1–3 weeks
Round RockAustin Energy / OncorCity of Round RockMixed territory · Growing suburban solar market · Williamson County1–3 weeks
Pflugerville / ManorAustin EnergyCity portalAustin Energy territory · Faster permit timelines than City of Austin core1–2 weeks
Bee Cave / LakewayPedernales ElectricCity portalPEC cooperative territory — different interconnection from Austin Energy2–4 weeks
Bastrop / ElginOncor / PECCity/County portalOutside Austin Energy territory · Confirm utility per address2–4 weeks

Also covered: Kyle, Buda, Georgetown, Hutto, and all Travis/Williamson/Hays County cities. References: Austin Energy VOS Tariff · Austin DSD · DSIRE Texas

What You Get

Solar Permit Package Austin — Austin Solar Permit Plan Sets. VOS-Ready. Austin DSD Formatted.

01
Cover Sheet — Austin PV Permit Plans
NEC 2020 · IBC/IRC 2021 · City of Austin DSD or Travis County AHJ · Austin Energy VOS tariff documentation · Production meter configuration noted
02
Site Plan
Meter and production meter locations · Austin Energy interconnection access · ASCE 7 Texas wind values · No significant seismic risk in Central Texas
03
Roof Layout
Array diagram · Pitch, azimuth, setbacks · Austin composition shingle and tile roofs · Fire code access paths per IFC 2021 §1205
04
Single-Line Diagram
NEC 2020 §690.12 rapid shutdown · Advanced inverter Rule 25 settings documented · Battery (Article 706) where included · Production meter + service meter configuration · Austin Energy VOS interconnection
05
Structural Calculations
IBC/IRC 2021 · ASCE 7 Texas wind loads · Gravity and lateral loads · PE stamp for commercial and >10kW where required by Austin DSD
06
Rapid Shutdown + Labels
NEC 2020 §690.12 rapid shutdown compliance · UL 3741 alternate pathway where applicable · Battery shutdown interface (Article 706)
07
Equipment Datasheets + Austin Energy Interconnection Package
UL-listed module, inverter (Rule 25 firmware confirmed), racking, and battery datasheets · Austin Energy VOS tariff interconnection application · Production meter service order documentation · Texas property tax exemption note · Texas sales tax exemption note

Austin Plan Set — 24 Hours.

Austin Energy VOS · Rule 25 Inverter · NEC 2020 · All Travis County AHJs

How It Works

Three Steps. 24 Hours. VOS-Ready.

📋
Submit the Project
Share the address, inverter model and firmware, and system design. We confirm the AHJ, Austin Energy Rule 25 inverter compliance, and NEC 2020 format for Austin DSD.
5 minutes
We Build the Plan Set
NEC 2020, IBC/IRC 2021. Austin DSD permit formatted. Austin Energy VOS interconnection package with production meter documentation. Rule 25 advanced inverter compliance documented. Battery (Article 706) where included.
24–48 hours
Submit and Get Approved
Submit Austin DSD permit application and Austin Energy interconnection application simultaneously. Free revisions for any AHJ correction related to our design.
Free revisions
🛡️
The Permit Design Commitment
Solar permit services in Austin — what every installer and EPC gets on every project.
Austin Energy Rule 25 inverter compliance confirmed before we build
VOS tariff documentation — production meter configuration included
24–48 hour delivery on standard residential solar projects
NEC 2020 formatted for Austin DSD — not California NEC 2026
Free revisions for any AHJ correction related to our design
Start Free Trial →
First plan set free.
Licensed installers & EPCs only.
FAQ

Questions Austin Installers Ask Us

Austin Energy's VOS tariff credits every kilowatt-hour your solar system generates at 9.91¢/kWh in 2026 — regardless of on-site consumption or export. Austin Energy meters total generation through a dedicated production meter and applies the VOS rate to that total. Separately, retail rates (~12¢/kWh) apply to all grid imports. This is not net metering — generation and consumption are metered independently. Size for maximum generation, not minimum export.
No. The Section 25D credit expired December 31, 2025 — not available for 2026 installations. Texas incentives remain: 100% property tax exemption on solar added value (permanent), sales tax exemption on equipment and labor, and Austin Energy's $2,500 rebate where funding remains.
Austin Energy Rule 25 requires inverters to support volt-VAR optimization, volt-Watt response, and frequency-watt response — IEEE 1547-2018 Category B requirements. Most modern inverters support these modes, but the firmware must be current. An inverter that can't document Rule 25 compliance gets the interconnection application rejected. We confirm model and firmware before building.
Austin uses NEC 2020 as the working electrical standard for solar permits in 2026. Texas municipalities adopt electrical codes independently — there's no statewide mandate. Austin has historically been progressive on building codes, but NEC 2026 adoption had not been confirmed as of July 2026. All Permit Design Austin plan sets reference NEC 2020 Article 690 for solar PV and Article 706 for battery storage.
Austin Energy historically offered a $2,500 residential solar rebate (reduced from $3,000 in prior years). Rebate availability depends on program funding allocation — confirm current availability with Austin Energy before quoting customers. Austin Energy's rebate is separate from the VOS tariff and Texas state incentives. Commercial systems have separate incentive structures through Austin Energy's Power Partner program.
All of it — City of Austin, Travis County, Round Rock, Cedar Park, Pflugerville, Manor, and all surrounding cities. Note that some outer Travis County and Williamson County addresses are served by Oncor or Pedernales Electric Cooperative (PEC) rather than Austin Energy — different utilities, different interconnection processes, and different plan set formats. We confirm the utility and AHJ for every address before building.
Most Austin residential plan sets ship in 24 to 48 hours. Battery permit plans same day. Commercial and complex projects: 3 to 5 business days. Rush available on request.
Reviewed by the Permit Design Engineering Team — Licensed PE Austin Energy VOS rate 9.91¢/kWh (2026) confirmed from Austin Energy tariff schedule. NEC 2020 confirmed as Austin working standard via Austin DSD. Federal Section 25D expiry (December 31, 2025) confirmed via IRS and DSIRE. Texas property tax exemption and sales tax exemption confirmed via Texas Comptroller. Austin Energy Rule 25 advanced inverter requirements confirmed from Austin Energy Distributed Generation Standard. Last reviewed July 2026.