Austin Solar
Permit Design.
Austin Energy VOS.
Not Net Metering. Know the Difference.
Austin solar permit drawings and PE-stamped plan sets for City of Austin and all Travis County AHJs. Austin Energy's Value of Solar tariff pays for ALL generation at 9.91¢/kWh — not just exports. Most solar proposals in Austin get this wrong. We get it right. Residential, commercial, battery, EV charger. Free for first-time clients.
Austin Energy's Value of Solar Is Not Net Metering. It Credits ALL Generation — Not Just What You Export. Most Solar Proposals in Austin Get This Wrong.
In most of California and in other Texas cities, solar economics depend on what you export to the grid. Austin Energy is different. The Value of Solar (VOS) tariff credits every kilowatt-hour your system generates — whether it's consumed on-site or exported — at a fixed rate. Austin Energy then charges you separately for every kilowatt-hour you pull from the grid at retail rates. Understanding this structure is essential to sizing Austin solar correctly.
Austin Energy Value of Solar Tariff — How It Actually Works
Your solar meter measures total kilowatt-hours generated — not net exports. Austin Energy credits that total at 9.91¢/kWh. Separately, your service meter measures all grid imports, charged at retail (~12¢/kWh). You pay retail for everything you pull; you get 9.91¢ for everything your panels produce, regardless of self-consumption. This is not net metering. Austin Energy requires a dedicated production meter alongside the service meter, which affects plan set format and interconnection application.
VOS Misrepresentation. No Federal Credit in 2026. Austin Energy's Inverter Requirements. Three Things That Trip Up Austin Solar Projects.
VOS-Formatted. NEC 2020. Austin DSD. All Travis County AHJs.
Four Things Shaping Austin Solar Right Now.
City of Austin DSD and All Travis County Jurisdictions — VOS Documented Every Time.
We cover City of Austin, Travis County, and all surrounding cities. AHJ confirmed per address, Austin Energy Rule 25 compliance verified before we build.
| Jurisdiction | Utility | Permit Portal | Key Notes | Review Time |
|---|---|---|---|---|
| City of Austin | Austin Energy | Austin DSD ePlan | VOS tariff · Rule 25 inverter · $200–400 fee · Fast-track green energy permits | 5–10 business days |
| Travis County (unincorp.) | Austin Energy | Travis County TRAKiT | Austin Energy service area extends into county · Confirm AHJ per address | 1–3 weeks |
| Cedar Park | Austin Energy / Oncor | City of Cedar Park | Mixed utility territory — confirm per address · Williamson County line | 1–3 weeks |
| Round Rock | Austin Energy / Oncor | City of Round Rock | Mixed territory · Growing suburban solar market · Williamson County | 1–3 weeks |
| Pflugerville / Manor | Austin Energy | City portal | Austin Energy territory · Faster permit timelines than City of Austin core | 1–2 weeks |
| Bee Cave / Lakeway | Pedernales Electric | City portal | PEC cooperative territory — different interconnection from Austin Energy | 2–4 weeks |
| Bastrop / Elgin | Oncor / PEC | City/County portal | Outside Austin Energy territory · Confirm utility per address | 2–4 weeks |
Also covered: Kyle, Buda, Georgetown, Hutto, and all Travis/Williamson/Hays County cities. References: Austin Energy VOS Tariff · Austin DSD · DSIRE Texas
Solar Permit Package Austin — Austin Solar Permit Plan Sets. VOS-Ready. Austin DSD Formatted.
Austin Plan Set — 24 Hours.
Austin Energy VOS · Rule 25 Inverter · NEC 2020 · All Travis County AHJs
Three Steps. 24 Hours. VOS-Ready.
Licensed installers & EPCs only.