Building Permit Required — Unlike Houston.
Dallas solar permit drawings and plan sets for City of Dallas and all Dallas County AHJs. Dallas is in Oncor's ERCOT territory — same deregulated market as Houston, but Dallas requires both a building permit and an electrical permit for residential solar. Your customer also needs a solar buyback REP before the system goes live. Free for first-time clients.
Dallas Is in the Same Oncor ERCOT Market as Fort Worth. But Dallas Requires a Building Permit Alongside the Electrical Permit — and Your Customer Still Needs a Solar Buyback REP.
Installers who work both Houston and Dallas sometimes assume Dallas follows Houston's electrical-only permit process. It doesn't. Dallas Building Inspection requires both a building permit and an electrical permit for residential solar. The other constant is ERCOT: Oncor distributes electricity but doesn't buy solar exports. Your customer needs a solar buyback REP enrolled before the system goes live, or every exported kilowatt-hour earns nothing.
Houston Plan Sets Don't Work in Dallas. Suburban AHJ Fragmentation. Municipal Utility Pockets in a Deregulated Market.
Building + Electrical. Oncor Interconnection. NEC 2020. All Dallas County AHJs.
Four Things That Define Solar in Dallas.
City of Dallas and All Dallas County Jurisdictions — Utility and AHJ Confirmed Per Address.
We cover City of Dallas and all DFW suburbs. Utility confirmed per address — Oncor, Garland Power & Light, or Denton Municipal Electric before we build anything.
| Jurisdiction | Utility | Permit Type | Key Notes | Review Time |
|---|---|---|---|---|
| City of Dallas | Oncor | Bldg + Elec | Dallas Building Inspection · $300–600 fee · 3–5 week plan check | 3–5 weeks |
| Plano | Oncor | Bldg + Elec | City of Plano Building Inspections · Collin County growth market | 2–4 weeks |
| Irving | Oncor | Bldg + Elec | City of Irving · DFW airport corridor · Commercial solar growing | 2–4 weeks |
| Garland | Garland P&L | Bldg + Elec | Municipal utility — NOT Oncor · Different interconnection process entirely | 3–5 weeks |
| Richardson / Allen | Oncor | Bldg + Elec | Tech corridor · Strong residential and commercial solar market | 2–3 weeks |
| Mesquite / Grand Prairie | Oncor | Bldg + Elec | Dallas County · Oncor territory · Standard DFW permit process | 2–4 weeks |
| Denton | Denton Muni | Bldg + Elec | Denton Municipal Electric — NOT Oncor · Separate interconnection and net metering program | 3–5 weeks |
Also covered: Carrollton, Farmers Branch, Rowlett, Sachse, Wylie, Frisco, McKinney, and all DFW metro cities. References: Dallas Building Inspection · Oncor Solar Interconnection · PowerToChoose.org
Solar Permit Package Dallas — Dallas Solar Permit Plan Sets. Building + Electrical. Oncor Ready.
Dallas Plan Set — 24 Hours.
Building + Electrical Permits · Oncor Interconnection · NEC 2020 · All Dallas County AHJs
Three Steps. 24 Hours. Dallas Building Inspection Ready.
Licensed installers & EPCs only.