San Antonio Solar
Permit Design.
CPS Energy Net Billing.
Battery Saves the Good Tier.
San Antonio solar permit drawings and plan sets for City of San Antonio and all Bexar County AHJs. CPS Energy credits solar at full retail up to your monthly usage — then drops to 2–4¢/kWh for any excess. Battery keeps more generation in the high-value tier. Residential rebate depleted. Commercial still active. Free for first-time clients.
CPS Energy Pays Full Retail Up to Your Monthly Usage. After That, the Rate Drops to 2–4¢/kWh. Battery Is the Tool That Keeps More Generation in the Good Tier.
CPS Energy's net billing is better than most ERCOT deregulated programs — but it's not traditional net metering. Solar up to monthly consumption credits at full retail. Anything beyond that earns 2 to 4 cents per kilowatt-hour. System sizing and battery strategy are very different here than in a net metering market.
Oversized Systems Hurt Customers. Depleted Residential Rebate Changes the Conversation. CPS Registration Is Non-Negotiable.
CPS Formatted. NEC 2020. Two-Tier Net Billing. All Bexar County AHJs.
Four Things Shaping Solar in San Antonio Right Now.
City of San Antonio Development Services and All Bexar County Jurisdictions — CPS Formatted Every Time.
We cover City of San Antonio, Bexar County, and surrounding cities. CPS Energy registered contractor status confirmed before we build interconnection documentation.
| Jurisdiction | Utility | Portal | Key Notes | Review Time |
|---|---|---|---|---|
| City of San Antonio | CPS Energy | SA Development Services | CPS registered contractor required · Generator application + building permit · $275–525 fee | 1–3 weeks |
| Bexar County (unincorp.) | CPS Energy | Bexar County | CPS territory extends into county · Confirm AHJ per address | 1–3 weeks |
| Helotes / Leon Valley | CPS Energy | City portal | CPS service area · Residential growth market · Suburban rooftop solar | 1–3 weeks |
| New Braunfels | NBU (muni) | City of NB | New Braunfels Utilities — separate from CPS · Confirm utility before building plan set | 2–4 weeks |
| Schertz / Seguin | CPS / GVEC | City portal | Mixed territory — CPS and Guadalupe Valley Electric Co-op depending on address | 2–4 weeks |
| Boerne / Kerrville | GBRA / CPL | City portal | Outside CPS territory — confirm utility per address · Hill Country area | 2–4 weeks |
| Converse / Universal City | CPS Energy | City portal | Military adjacent · CPS territory · Growing residential solar market | 1–2 weeks |
Also covered: Selma, Live Oak, Kirby, Somerset, and all Bexar County cities. References: CPS Energy Solar Program · SA Development Services · DSIRE Texas
Solar Permit Package San Antonio — San Antonio Solar Permit Plan Sets. CPS-Ready. Development Services Formatted.
San Antonio Plan Set — 24 Hours.
CPS Energy Formatted · NEC 2020 · Two-Tier Net Billing · Battery + EV · All Bexar County AHJs
Three Steps. 24 Hours. CPS-Ready.
Licensed installers & EPCs only.