Tampa Solar
Permit Design.
TECO Net Metering.
Hurricane Wind Zone · Not HVHZ.
Tampa solar permit drawings for City of Tampa and Hillsborough County. TECO (Tampa Electric Company) is the primary utility with a net metering program. Tampa is in a significant hurricane wind zone but is NOT in the HVHZ — no Miami-Dade NOA required. Florida Building Code, NEC 2020. Florida property tax and sales tax exemptions. Free for first-time clients.
TECO Net Metering Credits Solar Exports. Tampa Is in a Significant Hurricane Wind Zone — But Not the HVHZ. Florida’s Property Tax and Sales Tax Exemptions Apply After the Federal 25D Expiration.
TECO (Tampa Electric Company, a subsidiary of Emera) serves Hillsborough County with a net metering program. Tampa sits in a significant Gulf Coast hurricane wind zone with ASCE 7 values that require proper structural calculations for solar racking and attachment. But Tampa is not in the High Velocity Hurricane Zone — the Miami-Dade NOA certification process doesn’t apply here. Florida’s 100% property tax exemption and sales tax exemption are the primary financial incentives after the federal 25D credit expired.
Wrong Wind Zone Calcs. Insurance Documentation Missing. TECO Interconnection Not Formatted.
TECO Interconnection. NEC 2020. All Tampa AHJs.
Four Things That Define Solar in Tampa.
Tampa and All Surrounding Jurisdictions — TECO Interconnection Formatted.
We cover City of Tampa, Hillsborough County, and surrounding Tampa Bay metro jurisdictions. Utility confirmed per address.
| Jurisdiction | Utility | Permit Type | Key Notes | Review Time |
|---|---|---|---|---|
| City of Tampa | TECO | Bldg + Elec | City of Tampa Building · $350–700 fee · 2–3 week review · FBC NEC 2020 | 2–3 weeks |
| Hillsborough County (unincorp.) | TECO | Bldg + Elec | Hillsborough County Building · Covers unincorporated areas | 2–4 weeks |
| St. Petersburg / Pinellas County | Duke Energy FL | Bldg + Elec | Pinellas County · Duke Energy FL territory · Own building depts | 2–4 weeks |
| Clearwater / Pinellas | Duke Energy FL | Bldg + Elec | City of Clearwater Building · Pinellas County Duke territory | 2–3 weeks |
| Brandon / Riverview | TECO | Bldg + Elec | Hillsborough County unincorp. · TECO territory · Strong residential market | 2–4 weeks |
| Lakeland / Polk County | TECO / Lakeland Electric | Bldg + Elec | Polk County · Some areas Lakeland Electric municipal · Confirm utility | 2–4 weeks |
| New Tampa / Wesley Chapel | TECO | Bldg + Elec | North Hillsborough / Pasco County · Confirm county and utility per address | 2–4 weeks |
References: TECO Solar · City of Tampa Building
Solar Permit Package Tampa — Tampa Solar Permit Plan Sets. TECO Ready.
Three Steps. 24 Hours. Tampa AHJ Ready.
Licensed installers & EPCs only.