Tampa Solar Permit Design.
TECO Net Metering. Hurricane Wind Zone · Not HVHZ.

Tampa solar permit drawings for City of Tampa and Hillsborough County. TECO (Tampa Electric Company) is the primary utility with a net metering program. Tampa is in a significant hurricane wind zone but is NOT in the HVHZ — no Miami-Dade NOA required. Florida Building Code, NEC 2020. Florida property tax and sales tax exemptions. Free for first-time clients.

TECO Tampa Electric net metering
·
Not HVHZ Hurricane wind zone · No NOA required
·
FL Tax Exempt Property + sales tax exemptions
·
Free AHJ revisions
TECOTampa Electric net metering · Hillsborough County
Not HVHZHurricane wind zone · Standard FBC requirements
FL Tax Exempt100% property tax · Sales tax on equipment
24–48 hrStandard plan set delivery
2026 CodesElectrical: NEC 2020 (Florida Building Code)Structural: FBC 8th Edition / IBC 2021Utility: TECO (Tampa Electric Company) · Net meteringWind zone: Hillsborough County ASCE 7 · Not HVHZLast verified July 2026
Tampa Solar — TECO Net Metering, Hurricane Wind Zone, Florida Incentives

TECO Net Metering Credits Solar Exports. Tampa Is in a Significant Hurricane Wind Zone — But Not the HVHZ. Florida’s Property Tax and Sales Tax Exemptions Apply After the Federal 25D Expiration.

TECO (Tampa Electric Company, a subsidiary of Emera) serves Hillsborough County with a net metering program. Tampa sits in a significant Gulf Coast hurricane wind zone with ASCE 7 values that require proper structural calculations for solar racking and attachment. But Tampa is not in the High Velocity Hurricane Zone — the Miami-Dade NOA certification process doesn’t apply here. Florida’s 100% property tax exemption and sales tax exemption are the primary financial incentives after the federal 25D credit expired.

TECO Net Metering — Tampa Electric Company, Hillsborough County
TECO net metering: generation offsets consumption at full retail rate
TECO interconnection application · 4–8 weeks typical
⚠️Some Pasco and Pinellas County addresses served by Duke Energy Florida — confirm per address
City of Tampa or Hillsborough County Building — AHJ confirmed per address
NEC 2020 under Florida Building Code
Hurricane Wind Zone — Not HVHZ · FL Tax Exemptions Apply
Tampa is NOT in the HVHZ — Miami-Dade NOA not required for racking components
⚠️Hillsborough County is in a significant hurricane wind zone — ASCE 7 calcs required
⚠️Gulf Coast proximity increases wind load requirements vs inland Florida markets
Florida 100% property tax exemption on solar added home value — permanent
Florida sales tax exemption on solar equipment and installation labor
⚠️ Tampa wind zone ASCE 7 values are significant. Plan sets with generic non-Florida racking specifications fail Florida Building Code structural review. Hurricane-rated attachment and uplift calcs are required for every Tampa installation. We format every Tampa plan set for Hillsborough County FBC wind compliance.
Why Tampa Installers Outsource

Wrong Wind Zone Calcs. Insurance Documentation Missing. TECO Interconnection Not Formatted.

🌪️
Plan Sets Without Tampa’s Hurricane Wind Zone Structural Calculations
Hillsborough County’s position on the Gulf Coast means ASCE 7 wind load values are higher than inland Florida markets. Hurricane-rated racking specifications and roof attachment uplift calculations are required under the Florida Building Code. Plan sets with generic racking specifications not tailored to Tampa’s wind zone fail FBC structural plan review and delay permits.
💼
Florida Homeowner Insurance Now Requires FBC Documentation for Solar
Post-hurricane, Florida homeowner insurers have added requirements for solar installations. Many require Florida Building Code compliance documentation, proper attachment uplift specs, and contractor licensing verification before approving coverage for homes with solar. Incomplete plan sets without FBC-specific documentation can delay insurance approval and hold up project completion.
TECO Interconnection vs Duke Energy Florida — Different Process for Different Addresses
Most of Hillsborough County is TECO territory, but some areas — particularly near Pasco and Pinellas county lines — may be served by Duke Energy Florida. The two utilities have different interconnection application processes. Submitting a TECO application for a Duke address gets rejected. We confirm utility per address before building every Tampa plan set.
Tampa Solar Permit Services

TECO Interconnection. NEC 2020. All Tampa AHJs.

🏠
Tampa Residential Solar Permit Design
NEC 2020, FBC 8th Edition. TECO or Duke interconnection confirmed per address. Hillsborough County hurricane wind zone structural calcs. FBC compliance documentation for insurance. Battery (NEC 2020 Article 706) where included.
NEC 2020 FBCTECO InterconnectionHurricane Wind Zone
Residential Solar Permit Design Services →
🏗️
Tampa Commercial Solar Permit Design
Commercial rooftop drawings for Hillsborough County. NEC 2020, FBC/IBC. TECO commercial interconnection. Tampa Bay area port, logistics, healthcare, and financial services sector creates commercial solar demand. PE stamp. Gulf Coast hurricane wind structural calcs.
FBC / IBCGulf Coast WindPE Stamp
Commercial Solar Permit Design Services →
🔋
Tampa Battery Permit Plans
Solar-paired and standalone battery permit drawings. NEC 2020 Article 706. Tampa Bay’s hurricane season and post-Ian insurance landscape have created strong battery resilience demand. Battery adds grid independence during extended storm outages — a concrete and lived concern for Gulf Coast homeowners.
NEC 2020 Art.706Hurricane ResilienceGulf Coast
Battery Storage Permit Design Services →
🚗
Tampa EV Charger Permit Design
EV charger permit drawings for Hillsborough County. NEC 2020 Article 625, load calculations. Tampa’s growing healthcare, financial services, and logistics sector drives commercial EV fleet demand. Strong residential Level 2 demand in south Tampa, Westchase, and Carrollwood suburban markets.
NEC 2020 Art.625Commercial FleetLoad Calcs
EV Charger Permit Design Services →
Tampa Solar Market — 2026

Four Things That Define Solar in Tampa.

TECO
Tampa Electric Net Metering — Credits Solar Generation Against Consumption
TECO (Tampa Electric Company, an Emera subsidiary) serves Hillsborough County with a net metering program that credits solar generation against consumption at the full retail rate. Excess monthly credits roll forward. TECO interconnection applications for residential solar under 10kW typically process in 4 to 8 weeks. Submit the TECO application simultaneously with the City of Tampa or Hillsborough County permit application.
Not HVHZ
Tampa Is Not in the HVHZ — But the Gulf Coast Wind Zone Requires Proper Calcs
The High Velocity Hurricane Zone covers Miami-Dade and Broward counties only. Tampa installations use standard Florida Building Code wind requirements — no Miami-Dade NOA required. However, Hillsborough County’s Gulf Coast position means ASCE 7 wind loads are significant — higher than inland Florida markets. Every Tampa plan set must include Hillsborough County-specific wind zone structural calculations under Florida Building Code.
Insurance
Post-Hurricane FL Insurance — Solar Documentation Matters More Than Ever
Post-Ian, Irma, and Milton, Florida’s homeowner insurance market has added requirements for solar properties. Many insurers require FBC compliance documentation, proper roof attachment uplift specs, and sometimes supplemental inspections for homes with solar. A well-documented plan set with clear FBC structural compliance — including attachment details and wind load calcs — supports smoother insurance approval and coverage maintenance.
Battery
Hurricane Season Makes Battery a Compelling Tampa Conversation
Tampa Bay’s proximity to hurricane tracks and the memories of post-storm outages make battery storage a concrete residential conversation, not just an abstract ROI argument. Battery backup that powers essential home loads during multi-day grid outages — refrigeration, medical devices, lighting, communication — is a lived need for Gulf Coast homeowners. Battery plus solar also maximizes self-consumption of TECO net metering credits.
AHJ Solar Permit Design Tampa

Tampa and All Surrounding Jurisdictions — TECO Interconnection Formatted.

We cover City of Tampa, Hillsborough County, and surrounding Tampa Bay metro jurisdictions. Utility confirmed per address.

JurisdictionUtilityPermit TypeKey NotesReview Time
City of TampaTECOBldg + ElecCity of Tampa Building · $350–700 fee · 2–3 week review · FBC NEC 20202–3 weeks
Hillsborough County (unincorp.)TECOBldg + ElecHillsborough County Building · Covers unincorporated areas2–4 weeks
St. Petersburg / Pinellas CountyDuke Energy FLBldg + ElecPinellas County · Duke Energy FL territory · Own building depts2–4 weeks
Clearwater / PinellasDuke Energy FLBldg + ElecCity of Clearwater Building · Pinellas County Duke territory2–3 weeks
Brandon / RiverviewTECOBldg + ElecHillsborough County unincorp. · TECO territory · Strong residential market2–4 weeks
Lakeland / Polk CountyTECO / Lakeland ElectricBldg + ElecPolk County · Some areas Lakeland Electric municipal · Confirm utility2–4 weeks
New Tampa / Wesley ChapelTECOBldg + ElecNorth Hillsborough / Pasco County · Confirm county and utility per address2–4 weeks

References: TECO Solar · City of Tampa Building

What You Get

Solar Permit Package Tampa — Tampa Solar Permit Plan Sets. TECO Ready.

01
Cover Sheet — Tampa PV Permit Plans
NEC 2020 · FBC 8th Ed. / IBC 2021 · Tampa AHJ · TECO utility
02
Site Plan
Meter and TECO interconnection access · ASCE 7 local wind values · Applicable wind zone
03
Roof Layout
Tampa rooftop conditions · Array diagram · Pitch, azimuth, setbacks · IFC fire access paths
04
Single-Line Diagram
NEC 2020 §690.12 rapid shutdown · Battery (Article 706) where included · TECO bidirectional meter
05
Structural Calculations
FBC 8th Ed. / IBC 2021 · ASCE 7 local wind loads · Gravity and lateral loads · PE stamp for commercial
06
Rapid Shutdown + Labels
NEC 2020 §690.12 · Battery shutdown interface (Article 706)
07
Equipment Datasheets + TECO Interconnection Package
UL-listed module, inverter, racking, and battery datasheets · TECO interconnection application · State solar incentive notes

Tampa Plan Set — 24 Hours.

TECO Interconnection · NEC 2020 · All Tampa AHJs

How It Works

Three Steps. 24 Hours. Tampa AHJ Ready.

📋
Submit the Project
Share address, specs, and design. We confirm the AHJ, TECO interconnection, and NEC 2020 format.
5 minutes
We Build the Plan Set
NEC 2020, FBC 8th Ed. / IBC 2021. Tampa AHJ formatted. TECO interconnection package. Battery where included.
24–48 hours
Submit Permit + Interconnection
Submit City of Tampa or Hillsborough County permit and TECO interconnection simultaneously. TECO interconnection: 4 to 8 weeks. Free revisions for any AHJ correction on our design.
Free revisions
🛡️
The Permit Design Commitment
Solar permit services in Tampa — what every installer and EPC gets.
AHJ confirmed per address before we build
TECO interconnection package included
24–48 hour delivery on standard residential projects
NEC 2020 formatted for FL — not California NEC 2026
Free revisions for any AHJ correction on our design
Start Free Trial →
First plan set free.
Licensed installers & EPCs only.
FAQ

Questions Tampa Installers Ask Us

TECO (Tampa Electric Company, an Emera subsidiary) is the primary utility serving Hillsborough County with a net metering program. Some areas near the Pinellas County line and parts of Pasco County are served by Duke Energy Florida. We confirm utility per address before building.
No. The HVHZ is Miami-Dade and Broward counties only. Tampa uses standard Florida Building Code wind zone requirements. No Miami-Dade NOA required for racking components. However, Hillsborough County’s Gulf Coast position means hurricane wind loads are significant and must be calculated per FBC.
Florida 100% property tax exemption on solar added home value (permanent). Florida sales tax exemption on solar equipment and installation labor. Federal 25D residential credit expired December 31, 2025.
City of Tampa and Hillsborough County require a building permit and electrical permit. Submit TECO interconnection simultaneously. Typical review: 2 to 4 weeks.
NEC 2020 under the Florida Building Code (FBC 8th Edition).
Florida has no statewide PE stamp requirement for standard residential rooftop solar. City of Tampa and Hillsborough County do not typically require a PE stamp for residential rooftop installations. Commercial projects require PE-stamped drawings.
Most Tampa residential plan sets ship in 24 to 48 hours. Battery same day. Commercial: 3 to 5 business days. Rush available.
Reviewed by the Permit Design Engineering Team — Licensed PE TECO (Tampa Electric, Emera subsidiary) net metering confirmed. HVHZ exclusion for Tampa confirmed (Miami-Dade and Broward only). Hillsborough County hurricane wind zone ASCE 7 requirements confirmed under Florida Building Code. FBC 8th Edition NEC 2020 confirmed. FL property tax and sales tax exemptions confirmed. Federal 25D expiration December 31, 2025 confirmed. Last reviewed July 2026.