Orlando Solar
Permit Design.
OUC or Duke Energy?
Florida Building Code · Not in HVHZ.
Orlando solar permit drawings for City of Orlando and Orange County. OUC (Orlando Utilities Commission) is the primary utility for most Orlando addresses; some areas are served by Duke Energy Florida — utility confirmed per address. Florida Building Code, NEC 2020. Not in the HVHZ. Florida property tax and sales tax exemptions apply. Free for first-time clients.
OUC Is a Municipal Utility With Its Own Interconnection Process. Some Orlando Addresses Use Duke Energy Florida. Utility Confirmed Before Building. Florida’s Property Tax and Sales Tax Exemptions Apply.
OUC (Orlando Utilities Commission) is a municipal utility serving most of Orlando and offers a net metering program separate from investor-owned utility programs. Some Orlando area addresses — particularly in Orange County outside core Orlando — are served by Duke Energy Florida. The two utilities have different interconnection applications and net metering terms. Florida’s property tax exemption on solar added home value and the sales tax exemption on equipment are the primary state-level incentives after the federal 25D credit expired December 31, 2025.
Wrong Utility Application. Hurricane Racking Specs Missing. Florida FBC Requirements Overlooked.
OUC / Duke Energy Interconnection. NEC 2020. All Orlando AHJs.
Four Things That Define Solar in Orlando.
Orlando and All Surrounding Jurisdictions — OUC / Duke Energy Interconnection Formatted.
We cover City of Orlando, Orange County, and surrounding Central Florida jurisdictions. Utility confirmed per address.
| Jurisdiction | Utility | Permit Type | Key Notes | Review Time |
|---|---|---|---|---|
| City of Orlando | OUC | Bldg + Elec | City of Orlando Building · $350–700 fee · 2–3 week review · FBC NEC 2020 | 2–3 weeks |
| Orange County (unincorp.) | OUC or Duke | Bldg + Elec | Orange County Building · Confirm OUC vs Duke per address | 2–4 weeks |
| Kissimmee / Osceola County | OUC / Duke | Bldg + Elec | Osceola County Building · Confirm utility per address | 2–4 weeks |
| Lake County | Duke Energy FL | Bldg + Elec | Lake County Building · Duke Energy Florida territory | 2–4 weeks |
| Seminole County | Duke Energy FL | Bldg + Elec | Seminole County Building · Duke Energy Florida territory | 2–3 weeks |
| Volusia County | Duke Energy FL | Bldg + Elec | Daytona / Volusia · Duke Energy FL territory | 2–4 weeks |
| Winter Park / Maitland | Duke Energy FL | Bldg + Elec | City Building Depts · Duke Energy FL · Adjacent to Orlando | 2–3 weeks |
References: OUC Solar Interconnection · City of Orlando Building
Solar Permit Package Orlando — Orlando Solar Permit Plan Sets. OUC / Duke Energy Ready.
Orlando Plan Set — 24 Hours.
OUC / Duke Energy Interconnection · NEC 2020 · All Orlando AHJs
Three Steps. 24 Hours. Orlando AHJ Ready.
Licensed installers & EPCs only.