Oakland solar permit drawings and PE-stamped plan sets for every Oakland AHJ. The hills are VHFHSZ — fire compliance is required up there. Flat Oakland needs none of it. Ava Community Energy is the CCA, but PG&E handles interconnection and NEM 3.0 applies. Get the right plan set for your address. Free for first-time clients.
The Oakland Hills Are VHFHSZ. The Flat Neighborhoods Below Aren't. The Plan Set Requirements Are Completely Different Depending on Which One You're Installing In.
Oakland isn't one solar market — it's two. The hills above Highway 13 include Very High Fire Hazard Severity Zones through Montclair, Joaquin Miller, and Redwood Heights. The flat urban grid below — Fruitvale, Temescal, West Oakland — has no FHSZ designation. If you're working both sides of Oakland, you need a partner who builds the right plan set for the right zone.
Fire Zones, Ava vs PG&E Confusion, Dense Urban Rooftops. Oakland Has Real Complexity.
Hills Zone or Flat. Battery and EV. All Oakland and Alameda County AHJs.
Four Things Shaping Solar in Oakland Right Now.
Oakland, Alameda County, and the Full East Bay — VHFHSZ Confirmed Per Address.
We cover Oakland Building Services Division, Alameda County, and all surrounding East Bay cities. FHSZ status confirmed per address before we build.
| Jurisdiction | Utility | Fast-Track | VHFHSZ | Review Time |
|---|---|---|---|---|
| Oakland — Flat Zone | PG&E (Ava CCA) | SolarApp+ | None | Same day–3 wks |
| Oakland — Hill Zone | PG&E (Ava CCA) | Manual | VHFHSZ | 2–4 weeks + fire review |
| Berkeley | PG&E (Ava CCA) | SolarApp+ | Hills only | Same day–3 wks |
| Piedmont | PG&E (Ava CCA) | Manual | VHFHSZ | 2–4 weeks |
| San Leandro | PG&E (Ava CCA) | SolarApp+ | None | Same day–2 wks |
| Emeryville | PG&E (Ava CCA) | Manual | None | 2–3 weeks |
| Alameda County (unincorp.) | PG&E (Ava CCA) | SolarApp+ | Varies | Same day–3 wks |
Also covered: Fremont, Newark, Union City, Hayward, Castro Valley, San Lorenzo, Livermore, Dublin, Pleasanton. References: Oakland Building Services · PG&E NEM 3.0 · CAL FIRE FHSZ Map
Solar Permit Package Oakland — Oakland Solar Permit Plan Sets. VHFHSZ-Compliant Where Needed.
Oakland Plan Set — 24 Hours.
VHFHSZ compliant · PG&E NEM 3.0 · SGIP $150/kWh · Hills + Flat · All Oakland AHJs