San Jose Solar Permits.
PG&E NEM 3.0. SolarApp+.
Battery-First. 24 Hours.
PE-stamped plan sets for City of San Jose, Santa Clara County, and all surrounding Bay Area AHJs. PG&E NEM 3.0 interconnection, SGIP battery documentation, SolarApp+ fast-track. Silicon Valley's highest battery attachment rate means nearly every San Jose job includes storage. Free for first-time clients.
San Jose Is Fully on PG&E NEM 3.0. Battery Storage Is Not Optional — It's the Default Proposal in Silicon Valley.
Every City of San Jose address is served by PG&E for interconnection — regardless of whether the customer is enrolled in San Jose Clean Energy (SJCE). SJCE is a Community Choice Aggregation (CCA) that changes the electricity supplier, but PG&E still owns and operates the grid, handles interconnection applications, and applies NEM 3.0 to all new solar customers. Understanding this distinction prevents interconnection application errors.
NEM 3.0 Made Every San Jose Solar Job More Complex. Battery Documentation, Seismic Requirements, and SolarApp+ Eligibility Don't Simplify.
Residential, Commercial, Battery, and EV Charger Plan Sets for Silicon Valley Installers.
Four Numbers That Shape Solar in Silicon Valley.
San Jose AHJ Solar Permit Design — Santa Clara County Jurisdictions. PG&E Interconnection. SolarApp+ Ready.
Permit Design covers City of San Jose, Santa Clara County, and all surrounding cities. AHJ confirmed per address, SolarApp+ eligibility assessed before we build.
| Jurisdiction | Utility | Fast-Track | Key Notes | Review Time |
|---|---|---|---|---|
| City of San Jose | PG&E (SJCE CCA) | SolarApp+ | Building Division · Bulletin #282 · SolarApp+ for qualifying systems · SJCE CCA does not change interconnection | Same day–3 wks |
| Santa Clara County (unincorp.) | PG&E | SolarApp+ | Dept. of Planning and Development · SolarApp+ available | Same day–2 wks |
| Sunnyvale | PG&E | SolarApp+ | Strong solar market · High battery attachment | 1–3 weeks |
| Santa Clara | Silicon Valley Power (SVP) | Manual | SVP is a separate municipal utility — own NEM program, own interconnection · NOT PG&E | 2–4 weeks |
| Mountain View / Los Altos | PG&E | SolarApp+ | Affluent demographics · High battery adoption | 1–2 weeks |
| Cupertino / Saratoga | PG&E | SolarApp+ | High home values · Premium battery systems common · Hillside lots: structural assessment needed | 1–3 weeks |
| Milpitas / Gilroy | PG&E | Manual | Industrial solar growing in Milpitas · Gilroy: agricultural ground mount interest | 2–4 weeks |
| Morgan Hill / Los Gatos | PG&E | Manual | South County foothill lots · Tile roofs · Wildfire zones east | 2–3 weeks |
Also covered: Campbell, Los Gatos, Monte Sereno, and all Santa Clara County cities. Note: City of Santa Clara (SVP utility) and City of Palo Alto (CPAU utility) are separate municipal utilities — not PG&E. Permit Design confirms the utility for every address. References: San Jose Solar Permits · PG&E NEM 3.0 Interconnection · DSIRE California
San Jose Solar Permit Package — Solar Permit Plan Sets. PE-Stamped. SolarApp+ Ready. PG&E NEM 3.0 Interconnection.
San Jose Plan Set — 24 Hours.
PG&E NEM 3.0 · SGIP Battery · SolarApp+ · All Santa Clara County AHJs
Three Steps. 24 Hours. AHJ-Ready.
Licensed installers & EPCs only.