Permit Design PERMITDESIGN
Alameda County · CA NEC 2026 · SolSmart Platinum · PG&E NEM 3.0

Fremont Solar
Permit Design.
First in the Nation.
Instant Permits. $25.

Fremont solar permit drawings and PE-stamped plan sets for Alameda County. Fremont earned SolSmart Platinum — the first community in the country to do it. Instant Solar Permits via SolarApp+ for $25. Ava Community Energy is the CCA, but PG&E handles interconnection and NEM 3.0 applies. Free for first-time clients.

SolSmart Platinum city
·
$25 instant permit fee
·
SGIP $150/kWh battery
·
Free AHJ revisions
SolSmart PlatinumFirst community in the nation to earn this designation
$25Instant Solar Permit fee via SolarApp+ at City of Fremont
$150/kWhSGIP battery rebate for qualifying PG&E customers
24–48 hrStandard residential plan set delivery
2026 Codes Electrical: CA NEC 2026 (Title 24 Part 3) Structural: CBC 2025 / CRC 2025 Utility: PG&E NEM 3.0 · Ava CCA (generation only) Fast-track: SolarApp+ ISP · $25 · Citizen Access Portal Last verified July 2026
What Makes Fremont Different

Fremont Was the First City in the United States to Earn SolSmart Platinum. That's Not a Marketing Claim — It's a National Designation.

SolSmart is a national program run by IREC and the Department of Energy that rates cities on how effectively they reduce solar soft costs through permitting. Platinum is the highest designation. Fremont earned it first. The practical result for installers: Fremont has the fastest and lowest-cost solar permit pathway in the East Bay — and one of the best in California.

$25
Instant Solar Permit — SolarApp+ via Citizen Access Portal
Fremont's Instant Solar Permit (ISP) program uses SolarApp+ automated review. Qualifying residential rooftop solar systems — meeting SolarApp+ criteria for occupancy type, roof type, inverter database listing, and racking — get approved instantly through Fremont's online Citizen Access Portal for a $25 SolarApp+ fee plus standard city permit fees. Non-qualifying systems go through manual plan check, typically 2 to 4 weeks. Permit Design formats plan sets for ISP eligibility on every qualifying Fremont project.
Ava ≠ PG&E
Ava Community Energy Is the CCA — PG&E Still Handles Interconnection
Ava Community Energy (formerly East Bay Community Energy) is Fremont's electricity generation supplier — a Community Choice Aggregation. PG&E still owns and operates the grid and handles all solar interconnection applications. NEM 3.0 applies to all new Fremont solar customers through PG&E, regardless of Ava enrollment. Your plan set goes to PG&E for interconnection. Ava enrollment doesn't change the plan set format, the permit, or the NEM rate your customer receives.
Why Fremont Installers Outsource

Fast Permits Don't Mean Simple Plan Sets. NEM 3.0, Bay Area Seismic, and Tesla's Commercial Market All Raise the Stakes.

Submitting SolarApp+ Format When the System Doesn't Qualify Wastes the Whole Advantage
Fremont's ISP program is only as fast as the plan set submitted. Systems that don't meet SolarApp+ criteria — wrong inverter, non-standard racking, certain battery configurations — get routed to manual plan check. A plan set built for SolarApp+ on a system that doesn't qualify adds confusion and delay rather than saving time. We assess eligibility before we build and format accordingly.
🌍
Hayward Fault Runs Through the East Bay — Bay Area Seismic Is Real Here
The Hayward Fault passes through the hills east of Fremont and Newark. Fremont is in Seismic Design Category D. For residential rooftop, wind and gravity govern racking design — but commercial ground-mount and carport structures require CBC 2025 Chapter 16 seismic calcs that out-of-area firms sometimes omit on their first East Bay commercial job. Every Permit Design commercial plan set includes seismic documentation.
🚗
Tesla Gigafactory Is in Fremont — Commercial EV and Fleet Charging Is Growing Fast
Tesla's Fremont Gigafactory is one of the largest manufacturing facilities in California. The surrounding industrial corridor has significant commercial EV fleet charging demand — supplier facilities, logistics operations, and tech-adjacent businesses adopting EV fleets. Solar + battery + commercial EV charging is one of the most active project types in Fremont right now, and the permit documentation for all three together is more complex than any single service alone.
Fremont Solar Permit Services

ISP-Ready Plan Sets. PG&E NEM 3.0. Battery and EV. All Alameda County AHJs.

🏠
Fremont Residential Solar Permit Design
CA NEC 2026, CBC/CRC 2025, California PE stamp. PG&E NEM 3.0 interconnection. SolarApp+ ISP formatted where qualifying — $25 Citizen Access Portal pathway. Battery (Article 706) standard on most Fremont jobs given NEM 3.0. Ava CCA enrollment noted where applicable.
CA NEC 2026ISP SolarApp+PG&E NEM 3.0
Residential Solar Permit Design Services →
🏗️
Fremont Commercial Solar Permit Design
Commercial rooftop, carport, and ground-mount permit drawings. CBC 2025, CA NEC 2026, California PE stamp with SDC-D seismic calcs. PG&E commercial interconnection. Industrial corridor and tech campus configurations. Seismic documentation included — a common omission from out-of-area firms on first Bay Area commercial jobs.
SDC-D SeismicCarportCBC 2025
Commercial Solar Permit Design Services →
🔋
Fremont Battery Permit Plans
Solar-paired and standalone battery permit drawings. NEC 2026 Article 706, PG&E storage interconnection. SGIP $150/kWh for qualifying PG&E Fremont customers. With PG&E NEM 3.0 exports at $0.05–0.08/kWh versus Bay Area retail rates well above $0.35/kWh, battery economics in Fremont are strong.
NEC 2026 Art.706SGIP $150/kWhPG&E Storage
Battery Storage Permit Design Services →
🚗
Fremont EV Charger Permit Design
EV charger permit drawings for Fremont residential and commercial. CA NEC 2026 Article 625, load calculations, panel upgrade integration. Commercial fleet charging for the Fremont industrial corridor — Tesla supplier ecosystem, logistics, and tech campus Level 2 and DCFC configurations covered.
NEC 2026 Art.625Fleet DCFCPanel Upgrade
EV Charger Permit Design Services →
Fremont Solar Market — 2026

Four Things That Make Fremont the Most Installer-Friendly Solar City in the East Bay.

$25
Instant Solar Permit — Lowest Permit Barrier in Alameda County
Fremont's ISP fee of $25 through SolarApp+ — plus standard city permit fees — is one of the lowest permit cost structures for qualifying residential solar in California. The time saving is even more valuable: near-instant automated approval versus 2 to 4 weeks for manual plan check at most East Bay AHJs. For installers doing volume in Fremont, this is a meaningful competitive advantage.
NEM 3.0
PG&E NEM 3.0 Applies — Battery Is Standard on Most Fremont Jobs
Despite Fremont's fast permit pathway, PG&E NEM 3.0 still governs solar economics. Exports earn $0.05–0.08/kWh. PG&E Bay Area retail rates regularly exceed $0.35/kWh. Battery storage dispatching during evening peak avoids the most expensive grid power and delivers 4 to 7 times the per-kilowatt-hour value over exporting. Battery attachment rates in Fremont are high — NEC 2026 Article 706 documentation is standard on most plan sets we deliver here.
Ava CCA
Ava Community Energy — Generation Supplier, Not Grid Operator
Ava Community Energy (formerly EBCE) serves Fremont as the electricity generation supplier under Community Choice Aggregation. PG&E operates the grid and handles all interconnection. Your interconnection application goes to PG&E — not Ava. NEM 3.0 rates come from PG&E. Ava enrollment doesn't change the plan set, the permit, or the export credit. This is the same structure as SJCE in San Jose — a common source of confusion for installers new to the East Bay.
SDC-D
Bay Area Seismic — Hayward Fault Adjacent
Fremont is in Seismic Design Category D. The Hayward Fault runs through the East Bay hills. For residential rooftop solar, standard wind and gravity calcs apply. Commercial ground-mount and carport structures require CBC 2025 Chapter 16 seismic documentation — lateral load calculations, moment frame analysis where applicable, and PE structural sign-off. This documentation is required and non-negotiable for any Fremont commercial ground installation.
AHJ Solar Permit Design Fremont

Fremont, Alameda County, and the Full East Bay — ISP-Ready Where Available.

We cover City of Fremont, unincorporated Alameda County, and all surrounding East Bay cities. AHJ confirmed per address, ISP eligibility assessed before we build.

JurisdictionUtilityFast-TrackKey NotesReview Time
City of FremontPG&E (Ava CCA)ISP $25SolSmart Platinum · SolarApp+ ISP · Citizen Access Portal · $25 fee · AB 2188 compliantInstant–2 wks
NewarkPG&E (Ava CCA)SolarApp+Adjacent to Fremont · Alameda County Building · SolarApp+ availableSame day–2 wks
Union CityPG&E (Ava CCA)SolarApp+Tri-City area · PG&E NEM 3.0 · Ava CCA · SolarApp+ for qualifyingSame day–2 wks
HaywardPG&E (Ava CCA)SolarApp+South Alameda County · Dense residential market · Hayward Fault proximity1–3 weeks
MilpitasPG&EManualSanta Clara County AHJ (not Alameda) · Growing industrial solar · Near Fremont border2–4 weeks
OaklandPG&E (Ava CCA)SolarApp+Oakland Hills VHFHSZ — CFC §605.11 required for hill zone · Bay Area seismicSame day–3 wks
Alameda County (unincorp.)PG&E (Ava CCA)SolarApp+County Building Department · Hillside areas — confirm FHSZ per address1–3 weeks

Also covered: San Leandro, San Lorenzo, Castro Valley, Pleasanton, Livermore, Dublin, and all Alameda County cities. References: City of Fremont Building · PG&E NEM 3.0 · DSIRE California

What You Get

Solar Permit Package Fremont — Fremont Solar Permit Plan Sets. ISP-Ready. PE-Stamped.

01
Cover Sheet — Fremont PV Permit Plans
CA NEC 2026 · CBC/CRC 2025 · Confirmed AHJ · PG&E NEM 3.0 · SolarApp+ ISP format where qualifying · Ava CCA noted
02
Site Plan
Meter location · ASCE 7 Bay Area wind · SDC-D seismic notation · No FHSZ in Fremont flat zone
03
Roof Layout
Array diagram · Pitch, azimuth, setbacks · SB 1222 fire paths · Mix of tile and composition roofs in Fremont residential
04
Single-Line Diagram
CA NEC 2026 §690.12 · §690.12(D) labeling · Battery (Article 706) standard · PG&E NEM 3.0 bidirectional meter · SGIP notation
05
Structural Calculations
California PE stamp · CRC/CBC 2025 · Bay Area wind loads · SDC-D seismic for commercial ground-mount · Hayward Fault proximity noted for commercial
06
Rapid Shutdown + Labels
CA NEC 2026 §690.12(D) · UL 3741 PVHCS alternate path · Battery shutdown interface (Article 706)
07
Equipment Datasheets + PG&E NEM 3.0 Interconnection Package
UL-listed module, inverter, racking, MLPE, and battery datasheets · PG&E NEM 3.0 interconnection documentation · SGIP battery rebate reference · Ava CCA enrollment noted where applicable · CA property tax exclusion note

Fremont Plan Set — 24 Hours.

SolSmart Platinum · ISP $25 · PG&E NEM 3.0 · SGIP · All Alameda County AHJs

How It Works

Three Steps. 24 Hours. ISP-Ready.

📋
Submit the Project
Share the address, specs, and system design. We confirm AHJ, assess ISP eligibility for the SolarApp+ $25 pathway, and pull ASCE 7 Bay Area seismic and wind values.
5 minutes
We Build the Plan Set
CA NEC 2026, CBC/CRC 2025, California PE stamp. ISP-formatted where eligible. PG&E NEM 3.0 interconnection. Battery permit plans (Article 706) standard. SDC-D seismic calcs for commercial.
24–48 hours
Submit and Get Approved
ISP-qualified systems go through Fremont's Citizen Access Portal for instant approval. Non-qualifying projects go through plan check. If our design needs a revision, we handle it free.
Free revisions
🛡️
The Permit Design Commitment
Solar permit services in Fremont — what every installer and EPC gets on every project.
ISP eligibility assessed before we build — no format surprises at submission
PG&E NEM 3.0 interconnection formatted — not Ava CCA
24–48 hour delivery on standard residential solar projects
California PE stamp on all structural sheets
Free revisions for any AHJ correction related to our design
Start Free Trial →
First plan set free.
Licensed installers & EPCs only.
FAQ

Questions Fremont Installers Ask Us

Fremont earned SolSmart Platinum — the first community in the nation to do it. SolSmart is a national program run by IREC and DOE that rates cities on how well they reduce solar soft costs through permitting efficiency. Platinum is the top tier. The practical result: Fremont built an Instant Solar Permit program that lets qualifying residential solar systems get approved instantly for $25 through SolarApp+. For installers doing volume in Fremont, this is a real competitive edge.
Fremont's ISP uses SolarApp+ automated review. Qualifying systems — those that meet SolarApp+ criteria for occupancy type, roof type, inverter database listing, and racking configuration — get permit approval instantly through Fremont's Citizen Access Portal for $25. Non-qualifying systems route to standard plan check at 2 to 4 weeks. We assess ISP eligibility before we build so you know which pathway you're on before submitting.
Ava Community Energy (formerly EBCE) is Fremont's electricity generation supplier — a CCA. PG&E still operates the grid and handles every interconnection application. NEM 3.0 applies to all new Fremont solar customers through PG&E regardless of Ava enrollment. Your plan set goes to PG&E. Ava enrollment doesn't change the permit format, interconnection application, or export rate. Format for PG&E, always.
The 2025 California Electrical Code — California's adoption of NEC 2026, effective January 1, 2026 under Title 24 2025 Edition. All Alameda County jurisdictions are on the same code: Article 690 for solar PV, §690.12 rapid shutdown with §690.12(D) labeling, and Article 706 for battery storage.
Not required — but the NEM 3.0 math makes it compelling. PG&E exports earn $0.05–0.08/kWh. Bay Area retail runs well above $0.35/kWh. Battery that captures midday solar and dispatches during evening peak delivers 4 to 7 times the value per kilowatt-hour. SGIP covers $150/kWh for qualifying PG&E customers. Battery attachment in Fremont is high — Article 706 documentation is standard on most plan sets we build here.
All of it — City of Fremont, Newark, Union City, Hayward, Oakland, San Leandro, Pleasanton, Livermore, Dublin, and all Alameda County cities. Oakland Hill zone projects require additional CFC §605.11 fire pathway documentation due to VHFHSZ designation. We confirm FHSZ status and AHJ per address.
Most residential plan sets ship in 24 to 48 hours. Battery permit plans same day. Commercial, EV fleet, and complex projects: 3 to 5 business days. Rush available.
Reviewed by the Permit Design Engineering Team — California-Licensed PE CA Title 24 2025 Ed. (NEC 2026, eff. Jan 1, 2026) confirmed via CBSC. Fremont SolSmart Platinum designation (first in nation) confirmed from IREC SolSmart program records. Fremont ISP $25 fee and Citizen Access Portal confirmed from Fremont Building Safety. Ava Community Energy CCA — PG&E interconnection authority confirmed. PG&E NEM 3.0 (eff. April 15, 2023, CPUC D.22-12-056) confirmed. SGIP $150/kWh confirmed via CPUC. SDC-D seismic confirmed per ASCE 7. Last reviewed July 2026.
CA NEC 2026SolSmart Platinum ISP SolarApp+ $25PG&E NEM 3.0 Fremont Solar Drafting ServicesFremont Solar CAD Services July 2026