Arlington solar permit drawings for City of Arlington and Tarrant County. Arlington is the seventh-largest city in Texas — and it has its own City of Arlington Building Services department, entirely separate from Dallas and Fort Worth. Oncor ERCOT territory. Customers need a solar buyback REP before the system goes live. Free for first-time clients.
Arlington Is Not Dallas. Arlington Is Not Fort Worth. City of Arlington Building Services Is a Completely Separate Department — and Routing to the Wrong One Means an Immediate Rejection.
Arlington sits between Dallas and Fort Worth, but it’s neither. It’s the seventh-largest city in Texas with its own independent municipal government and building department. Installers working DFW for the first time often assume Arlington permits route through Dallas Building Inspection or Fort Worth Development Services. They don’t. A plan set submitted to either of those departments for an Arlington address gets rejected immediately — they have no jurisdiction. Oncor territory and ERCOT REP requirements are the same as both neighbors. The AHJ is not.
Wrong Department. Missing REP Enrollment. Commercial Plan Sets Formatted for Residential.
Oncor Interconnection. NEC 2020. Building + Electrical. All Arlington AHJs.
Four Things That Define Solar in Arlington.
Arlington and All Surrounding DFW AHJs — Oncor Interconnection Confirmed.
We cover City of Arlington and all surrounding DFW jurisdictions. Jurisdiction confirmed per address before we build.
| Jurisdiction | Utility | Permit Type | Key Notes | Review Time |
|---|---|---|---|---|
| City of Arlington | Oncor | Bldg + Elec | City of Arlington Building Services · Own portal · $350–650 fee · 3–5 week plan check | 3–5 weeks |
| Grand Prairie | Oncor | Bldg + Elec | City of Grand Prairie · Adjacent to Arlington · Own building department | 2–4 weeks |
| Mansfield | Oncor | Bldg + Elec | City of Mansfield · South Tarrant County · Growing residential market | 2–3 weeks |
| Irving | Oncor | Bldg + Elec | City of Irving · Dallas County · DFW airport corridor | 2–4 weeks |
| Euless / Bedford / Hurst | Oncor | Bldg + Elec | HEB cities — each separate AHJ despite adjacent geography | 2–3 weeks |
| Fort Worth (adjacent) | Oncor | Bldg + Elec | City of Fort Worth · Separate from Arlington · Fort Worth Development Services | 3–5 weeks |
| Dallas (adjacent) | Oncor | Bldg + Elec | City of Dallas · Separate from Arlington · Dallas Building Inspection | 3–5 weeks |
References: Arlington Development Services · Oncor Solar Interconnection · PowerToChoose.org
Solar Permit Package Arlington — Arlington Solar Permit Plan Sets. Oncor Ready. Building + Electrical.
Arlington Plan Set — 24 Hours.
Building + Electrical · Oncor Interconnection · NEC 2020 · All Arlington AHJs