Boston Solar
Permit Design.
Eversource Net Metering.
MA SMART Program · Many Metro AHJs.
Boston solar permit drawings for City of Boston and all Greater Boston AHJs. Eversource serves most of eastern Massachusetts with net metering at the retail rate. Massachusetts SMART program provides a fixed per-kWh payment over 10 years — a major state incentive beyond net metering. Many AHJs across Greater Boston. NEC 2020. MA property tax and sales tax exemptions. Free for first-time clients.
Massachusetts SMART Pays a Fixed Per-kWh Rate for 10 Years on Top of Net Metering. Earlier Enrollment Locks a Higher Rate. Many Greater Boston AHJs Confirmed Per Address.
Eversource serves most of eastern Massachusetts including Boston and its surrounding communities with net metering at the retail rate. Massachusetts SMART (Solar Massachusetts Renewable Target) layers a fixed per-kWh payment on top of net metering — paid over 10 years through the utility bill. SMART rates are set in declining blocks, so earlier applicants lock higher rates. The SMART program replaced the SREC II program and is administered by the Massachusetts DOER. Greater Boston has many separate building departments; we confirm the AHJ per address before building every plan set.
SMART Rate Block Not Communicated. AHJ Mismatch. National Grid vs Eversource Territory Confusion.
Eversource Interconnection. NEC 2020. All Boston AHJs.
Four Things That Define Solar in Boston.
Boston and All Surrounding Jurisdictions — Eversource Interconnection Formatted.
We cover City of Boston and all Greater Boston metro AHJs. Eversource interconnection formatted.
| Jurisdiction | Utility | Permit Type | Key Notes | Review Time |
|---|---|---|---|---|
| City of Boston | Eversource | Bldg + Elec | Boston Inspectional Services Dept · City addresses · 2–4 week review | 2–4 weeks |
| Cambridge | Eversource / RMLD | Bldg + Elec | City of Cambridge Building · Own dept · RMLD is municipal utility in some areas | 2–3 weeks |
| Newton / Brookline | Eversource | Bldg + Elec | Own city building depts · Affluent western suburbs | 2–3 weeks |
| Quincy / Braintree | Eversource | Bldg + Elec | Own city building depts · South Shore | 2–3 weeks |
| Somerville / Medford | Eversource | Bldg + Elec | Own city building depts · North of Boston | 2–3 weeks |
| Woburn / Burlington (Middlesex) | Eversource | Bldg + Elec | Own city building depts · NW suburban market | 2–3 weeks |
| Needham / Wellesley (Norfolk) | Eversource | Bldg + Elec | Own city building depts · High solar adoption suburbs | 2–3 weeks |
References: Eversource Net Metering · MA SMART Program
Solar Permit Package Boston — Boston Solar Permit Plan Sets. Eversource Ready.
Boston Plan Set — 24 Hours.
Eversource Interconnection · NEC 2020 · All Boston AHJs
Three Steps. 24 Hours. Boston AHJ Ready.
Licensed installers & EPCs only.