North Dakota
Solar Permit Plans.
NEC 2020. Net Metering Available.
MDU · Basin Electric · Xcel Energy · Rural Coops.
North Dakota solar permit plan sets for licensed solar installers, EPCs, and roofing companies statewide. Montana-Dakota Utilities (MDU), Basin Electric Power Cooperative, Xcel Energy, and rural electric cooperatives serve North Dakota with net metering available under NDPSC oversight. Extreme cold climate: ground snow loads of 20-30 psf and temperatures to -30F or colder require specific ASCE 7 structural and thermal specifications. NEC 2020. AHJ-ready statewide.
Montana-Dakota Utilities Serves Western North Dakota. Basin Electric Serves Rural Cooperatives Statewide. Xcel Energy Serves the Fargo Metro. Each Has Its Own Solar Program Under NDPSC Oversight.
Permit Design builds North Dakota solar permit plan sets for licensed solar installers, EPCs, and roofing companies statewide. Montana-Dakota Utilities (MDU) serves Bismarck, Mandan, Minot, Williston, and western North Dakota. Xcel Energy serves the Fargo-Moorhead metro and eastern North Dakota corridor. Basin Electric Power Cooperative provides wholesale power to many rural electric cooperatives serving agricultural North Dakota. Each utility and cooperative has its own interconnection application and net metering program under North Dakota Public Service Commission oversight.
North Dakota solar plan sets require ASCE 7 extreme cold climate structural calculations. Ground snow loads of 20 to 30 psf and temperatures reaching -30 degrees Fahrenheit or colder require hardware specifications that differ from continental US moderate-climate markets. North Dakota has a strong prairie solar resource — 4.8 to 5.5 peak sun hours statewide — and a large agricultural economy creating ground-mount and barn-rooftop solar demand. NEC 2020 applies statewide under the North Dakota Building Code.
North Dakota permitting is handled at the city and county level. Fargo (Xcel Energy territory) is handled by Fargo Inspections. Bismarck (MDU territory) is handled by Bismarck-Burleigh County Building Inspection. Grand Forks and Minot each have city building departments. Rural North Dakota county offices handle agricultural and unincorporated area permits. MDU interconnection and Xcel Energy interconnection are submitted simultaneously with the building permit. ASCE 7 extreme cold climate calcs and northern plains wind calcs are required in every ND structural section alongside snow load calcs.
MDU Serves Western ND. Xcel Energy Serves Fargo Metro. Basin Electric Powers Rural Cooperatives. Each Has Its Own Interconnection Application. Utility Confirmed Per Address Before Building.
Net Metering Available Under NDPSC Rules. ND Renewable Energy Tax Credit (Expired But Notable History). No Current State Income Tax Credit.
| Incentive | Status | Details |
|---|---|---|
| North Dakota Net Metering | Available | Net metering available from MDU, Xcel Energy, and most ND cooperatives under NDPSC oversight — confirm terms per utility |
| ND Renewable Energy Property Tax Exemption | Active | North Dakota Century Code 57-02-06.1 — renewable energy devices exempt from property tax assessment |
| ND State Income Tax Credit | None (2026) | North Dakota had a renewable energy tax credit historically — expired. No current state solar income tax credit in 2026. |
| ND Sales Tax Exemption | Partial | Renewable energy equipment may qualify for sales tax exemption under ND rules — confirm current status |
| Federal Residential Tax Credit (25D) | Expired | Federal 25D residential solar credit expired December 31, 2025 |
NEC 2020. IBC/IRC 2021. Extreme Cold Climate: 20-30 psf Snow. Temperatures to -30F. ASCE 7 Per Address.
Also doing commercial rooftop, carport, or ground-mount in North Dakota?
North Dakota commercial solar permit plan sets reference IBC 2021 with NEC 2020 electrical throughout. MDU and Xcel Energy both offer commercial net metering under NDPSC oversight. Extreme climate engineering: ASCE 7 cold climate snow calcs (20-30 psf), northern plains wind calcs, and extreme cold hardware specifications (-30°F) required in all ND commercial structural packages. NDCC 57-02-06.1 property tax exemption applies to qualifying commercial solar. Engineering support for commercial rooftop, agricultural ground-mount, and carport installations statewide.
Fargo (Xcel Energy), Bismarck (MDU), Grand Forks, and Minot Each Have Separate Building Departments. Extreme Cold and Northern Plains Wind Calcs Required in Every Structural Section.
Typical North Dakota Residential Solar Permit: 3 to 6 Weeks From Plan Set to PTO. Extreme Cold Climate Calcs and Northern Plains Wind Calcs Required in Every Structural Section.
Every North Dakota Plan Set: 7 Sheets. NEC 2020. MDU or Xcel Energy Interconnection Per Address. Net Metering Docs. Extreme Cold Climate + Snow + Wind Calcs.
The Permit Design Commitment — Every North Dakota Project
What every solar installer, EPC, and roofing company can expect on every North Dakota plan set we deliver.
North Dakota Solar Permit Design — Installer FAQ
Montana-Dakota Utilities (MDU, a Montana-Dakota Utilities subsidiary of MDU Resources Group) serves Bismarck, Mandan, Minot, Dickinson, Williston, Jamestown, and most of western and central North Dakota. Xcel Energy serves the Fargo-Moorhead metro and eastern North Dakota corridor. Basin Electric Power Cooperative provides wholesale power to Nodak Electric Cooperative, KEM Electric Cooperative, and other rural cooperatives serving agricultural North Dakota. Each utility and cooperative has its own solar interconnection application under North Dakota Public Service Commission oversight. We confirm utility per address before building every North Dakota plan set.
Yes. Net metering is available from MDU, Xcel Energy, and most North Dakota rural electric cooperatives under North Dakota Public Service Commission oversight. North Dakota Century Code 49-02-24 establishes the net metering framework for qualifying residential and commercial solar systems. Full retail 1:1 net metering credits every exported kilowatt-hour at the retail electricity rate. Monthly excess credits roll forward. MDU and Xcel Energy each have distinct program structures and interconnection requirements. Credit terms, system size limits, and interconnection requirements vary by utility and cooperative. Confirm current net metering terms with the specific utility per address before finalizing system design and financial projections. Agricultural North Dakota is served by Basin Electric-affiliated cooperatives with varying program structures.
North Dakota Century Code 57-02-06.1 provides a property tax exemption for renewable energy devices including solar energy systems — solar installations that increase property assessed value are exempt from the tax increase. Net metering is available from MDU, Xcel, and most cooperatives under NDPSC oversight. North Dakota had a state renewable energy tax credit historically but it has expired — no current ND state solar income tax credit exists in 2026. Renewable energy equipment may qualify for ND sales tax exemption — confirm current status. Federal 25D residential credit expired December 31, 2025.
NEC 2020 under the North Dakota Building Code, administered by the Office of the State Building Official, North Dakota Department of Commerce. North Dakota adopted NEC 2020 statewide for all electrical installations including solar PV systems. Article 690 governs ND solar PV system design — including rapid shutdown (Section 690.12), array wiring, inverter disconnect placement, and system labeling. Article 706 governs energy storage systems. Article 625 governs EV charging equipment. IBC 2021 and IRC 2021 are North Dakota's structural standards. Some ND municipalities may maintain local code amendments — confirm with the specific AHJ before finalizing plan set content. North Dakota adopted NEC 2020 statewide for all electrical installations including solar PV systems. Article 690 governs ND solar PV system design. Article 706 governs energy storage systems. Article 625 governs EV charging. IBC 2021 and IRC 2021 are North Dakota's structural standards. Some ND municipalities may maintain local code amendments — confirm with the specific AHJ before finalizing plan set content.
Yes — both are required, and a third: northern plains wind calcs. North Dakota ground snow loads of 20 to 30 psf statewide require ASCE 7 cold climate structural calculations in every ND plan set. Additionally, North Dakota temperatures can reach -30 degrees Fahrenheit or colder in some years — particularly in the northern tier counties and Red River Valley — requiring racking hardware specified for extreme temperature cycling and wiring conduit rated for extreme cold. Battery storage thermal management becomes important at these temperatures: lithium iron phosphate (LFP) chemistry handles cold better than NMC but both lose capacity significantly below freezing. The combination of cold climate snow loads, extreme cold hardware specifications, and northern plains wind loads makes North Dakota structural engineering among the most demanding in the continental US. Plan sets missing any one of these three ASCE 7 inputs fail North Dakota structural plan review.
North Dakota has no statewide PE stamp requirement for standard residential rooftop solar installations. MDU and Xcel Energy territory AHJs do not require a PE stamp for standard residential rooftop solar. Commercial solar installations require PE-stamped structural drawings. Ground-mount systems — particularly common in North Dakota's agricultural economy — require PE-stamped structural engineering for combined extreme-cold, snow, and wind load analysis. We coordinate PE stamp services for North Dakota commercial and agricultural ground-mount projects upon request.
North Dakota combines extreme cold (-30F possible) with moderate snow loads (20-30 psf), northern plains wind exposure, and a large agricultural economy. The multi-utility landscape — MDU in the west, Xcel in the east, and Basin Electric cooperatives statewide — means installers must confirm utility per address for every project. North Dakota also has a strong prairie solar resource (4.8-5.5 peak sun hours) that surprises many installers expecting poor production from a northern latitude state. Cold temperatures actually improve panel efficiency, partially compensating for shorter winter days.
Most North Dakota residential solar permit plan sets are delivered in 24 to 48 hours from project submission. Battery storage plan sets ship same day. Commercial solar: 3 to 5 business days. EV charger permit plan sets: 24 to 48 hours. All ND residential plan sets include MDU, Xcel Energy, or cooperative interconnection package, NDPSC net metering documentation, ASCE 7 extreme cold climate calcs, snow and wind structural calculations, NEC 2020 Article 690 single-line diagram, and all 7 plan set sheets. Rush delivery available.
North Dakota Is a Growing Solar Market. Extreme Cold Climate Creates Unique Engineering Needs. Strong Prairie Solar Resource.
New to Permit Design? Your First North Dakota Solar Permit Plan Set Is on Us.
Try our North Dakota plan sets with zero upfront commitment. Permit Design works exclusively with licensed solar installers, EPC companies, and roofing companies. Here's what you get on your first project:
Mention "free trial" in your order notes. One free residential plan set per new partner account. Available exclusively to licensed solar installers, EPC companies, and roofing companies that perform solar installation.
Permit Design builds North Dakota solar permit plan sets for licensed solar installers, EPCs, and roofing companies statewide. First plan set free for new installer partners. MDU, Xcel Energy, or cooperative interconnection formatted per address. NEC 2020. Extreme cold climate structural calcs. Residential solar permit drawings, solar drafting services, pv permit plans, battery permit plans, battery permit plans for ESS, and ev charger permit packages available for North Dakota. Solar drafting services for ND licensed installers statewide.
North Dakota Solar Installers Also Serve South Dakota, Montana, Minnesota, and Wyoming. Permit Design Builds Plan Sets for All Northern Plains States — With Extreme Cold Climate and Northern Plains Wind Requirements.
Top 4 Reasons North Dakota Solar Permits Get Rejected. Every One Is Avoidable With a Correct Plan Set.
These are the most common reasons North Dakota solar permit applications are rejected or delayed at plan review — and the reason Permit Design built North Dakota-specific knowledge into every plan set. Every plan set we deliver for North Dakota addresses all four of these issues before submission.
North Dakota Plan Set Guarantee
Every North Dakota plan set is NEC 2020 formatted — MDU or Xcel Energy interconnection, NDPSC net metering documentation, ASCE 7 extreme cold climate calcs. Free revisions for any AHJ correction. 24-48 hr turnaround. Plan sets reviewed by licensed professional engineer for North Dakota structural and electrical compliance. Last updated: July 2026.
Order Now →Last updated: July 2026. Plan sets reviewed by licensed professional engineer for North Dakota structural and electrical compliance.
MDU net metering confirmed under NDPSC. Xcel Energy ND net metering confirmed. Basin Electric cooperative confirmed. ND Century Code 57-02-06.1 property tax exemption confirmed. NEC 2020 ND adoption confirmed. IBC/IRC 2021 confirmed. ASCE 7 ND snow loads (20-30 psf) and extreme cold confirmed. Federal 25D expiration confirmed. Last reviewed July 2026. Solar drafting services, battery permit plans, pv permit plans, residential solar permit drawings, and ev charger permit packages formatted for North Dakota AHJ and utility requirements. Permit Design also builds solar permit plan sets for adjacent markets including Minneapolis MN and Omaha NE.