Tucson Solar
Permit Design.
TEP — Tucson Electric Power.
NOT APS or SRP · Pima County · 5.5+ Peak Sun Hours.
Tucson solar permit drawings for Pima County. TEP (Tucson Electric Power) is completely separate from APS and SRP — different utility, different interconnection application, different solar program. APS and SRP applications submitted to TEP are rejected. Arizona 25% state tax credit. 5.5+ peak sun hours. NEC 2020. Free for first-time clients.
Tucson Electric Power (TEP) Serves Pima County. APS Serves Phoenix. SRP Serves the East Valley. Different Utility, Different Application, Different Program. APS and SRP Applications Are Rejected by TEP.
TEP (Tucson Electric Power, a UNS Energy subsidiary) serves Pima County as a completely separate utility from APS and SRP. TEP has its own solar interconnection application, its own net metering program under Arizona Corporation Commission rules, and its own customer service process. Installers who work primarily in the Phoenix metro (APS or SRP territory) must use TEP's specific application when working in Tucson. Tucson has an excellent solar resource — 5.5 or more peak sun hours daily — comparable to Phoenix, and the Arizona 25% state tax credit applies.
APS or SRP Application Submitted to TEP. Pima County AHJ Mismatch. Desert Wind Calcs Missing.
TEP (Tucson Electric Power) Interconnection. NEC 2020. All Tucson AHJs.
Four Things That Define Solar in Tucson.
Tucson and All Surrounding Jurisdictions — TEP (Tucson Electric Power) Interconnection Formatted.
We cover City of Tucson and Pima County. TEP interconnection formatted — not APS or SRP.
| Jurisdiction | Utility | Permit Type | Key Notes | Review Time |
|---|---|---|---|---|
| City of Tucson | TEP | Bldg + Elec | City of Tucson Development Services · $350–700 fee · 2–4 week review | 2–4 weeks |
| Pima County (unincorp.) | TEP | County Bldg + Elec | Pima County Development Services · Unincorporated county addresses | 2–4 weeks |
| Marana (NW Tucson) | TEP | Bldg + Elec | Town of Marana Building · NW growth area · Own department | 2–3 weeks |
| Oro Valley (N. Tucson) | TEP | Bldg + Elec | Town of Oro Valley Building · Affluent NE suburb | 2–3 weeks |
| Sahuarita (S. Tucson) | TEP | Bldg + Elec | Town of Sahuarita Building · SW suburb · Own department | 2–3 weeks |
| South Tucson | TEP | Bldg + Elec | City of South Tucson · Small municipality within Tucson metro | 2–3 weeks |
| Vail / Corona de Tucson | TEP | Bldg + Elec | Pima County unincorp. · SE Tucson metro · Growing residential | 2–4 weeks |
References: TEP Solar · City of Tucson Development Services
Solar Permit Package Tucson — Tucson Solar Permit Plan Sets. TEP (Tucson Electric Power) Ready.
Tucson Plan Set — 24 Hours.
TEP (Tucson Electric Power) Interconnection · NEC 2020 · All Tucson AHJs
Three Steps. 24 Hours. Tucson AHJ Ready.
Licensed installers & EPCs only.