Portland Solar
Permit Design.
Portland General Electric · Oregon 1:1 Net Metering.
Oregon Energy Trust Incentives · Multiple Metro AHJs.
Portland solar permit drawings for City of Portland and all metro AHJs. Portland General Electric (PGE) serves most of the metro with Oregon 1:1 full retail net metering under 25 kW. Oregon Energy Trust offers cash incentives for qualifying installations. NEC 2020. Oregon property tax exemption on solar. Multiple AHJs — confirmed per address. Free for first-time clients.
Oregon Law Requires PGE to Offer Full Retail 1:1 Net Metering for Systems Under 25 kW. Oregon Energy Trust Offers Cash Incentives for Qualifying Installations. Multiple Portland Metro AHJs — Confirmed Per Address.
Portland General Electric (PGE) serves most of the Portland metro with Oregon 1:1 full retail net metering — every kilowatt-hour exported earns full retail rate credit for systems under 25 kW, as required by Oregon law. Oregon Energy Trust, a nonprofit administrator funded by PGE and Pacific Power, offers cash incentives for qualifying residential and commercial solar installations. Some Clackamas County areas use Pacific Power. The Portland metro has many separate building departments across Multnomah, Washington, and Clackamas counties. We confirm AHJ and utility per address before building every Portland plan set.
Wrong Utility Application. Oregon Energy Trust Documentation Missing. AHJ Mismatch.
Portland General Electric Interconnection. NEC 2020. All Portland AHJs.
Four Things That Define Solar in Portland.
Portland and All Surrounding Jurisdictions — Portland General Electric Interconnection Formatted.
We cover City of Portland and all Portland metro AHJs. PGE or Pacific Power interconnection formatted per address.
| Jurisdiction | Utility | Permit Type | Key Notes | Review Time |
|---|---|---|---|---|
| City of Portland | Portland General Electric | Bldg + Elec | Portland Bureau of Development Services · City-limit addresses · 2–4 week review | 2–4 weeks |
| Beaverton (Washington Co.) | PGE | Bldg + Elec | City of Beaverton Development Services · Own department | 2–3 weeks |
| Hillsboro (Washington Co.) | PGE | Bldg + Elec | City of Hillsboro Building · Intel / tech campus area | 2–3 weeks |
| Gresham (Multnomah Co.) | PGE | Bldg + Elec | City of Gresham Building · East Portland metro | 2–3 weeks |
| Lake Oswego / Tigard | PGE | Bldg + Elec | Own city building depts · Clackamas / Washington Co. | 2–3 weeks |
| Oregon City (Clackamas Co.) | Pacific Power | Bldg + Elec | City of Oregon City Building · Pacific Power territory · Confirm utility | 2–4 weeks |
| Washington County (unincorp.) | PGE | County Bldg + Elec | Washington County Building Services · Unincorporated areas | 2–4 weeks |
References: PGE Solar · Oregon Energy Trust Solar
Solar Permit Package Portland — Portland Solar Permit Plan Sets. Portland General Electric Ready.
Portland Plan Set — 24 Hours.
Portland General Electric Interconnection · NEC 2020 · All Portland AHJs
Three Steps. 24 Hours. Portland AHJ Ready.
Licensed installers & EPCs only.