Salt Lake City
Solar Permit Design.
Rocky Mountain Power Schedule 137.
Exports at 5.6¢ · Self-Consumption Essential.
Salt Lake City solar permit drawings for Salt Lake County. Rocky Mountain Power (RMP) customers on Schedule 137 export at 5.636¢/kWh summer and 4.745¢/kWh winter — roughly half the retail rate. Self-consumption is far more valuable than exporting. Battery captures midday surplus for evening use. RMP’s 18% rate increase in early 2025 further increased the value of self-consumed solar. Free for first-time clients.
RMP New Customers Export at 5.6¢/kWh in Summer and 4.7¢/kWh in Winter. Retail Electricity Costs ~10¢. Self-Consumption Is 2× More Valuable Than Exporting. Battery Changes the Economics.
Rocky Mountain Power’s Schedule 137 (Net Billing) applies to new Utah solar customers since October 2020. Export credits are 5.636 cents per kWh June through September and 4.745 cents per kWh October through May — approximately half the retail electricity rate of around 10 cents. Traditional net metering (Schedule 135) closed to new customers in November 2017 and is grandfathered to December 2035. RMP implemented an 18% rate increase in early 2025, widening the gap between self-consumed solar value and export credit value. Battery is the key tool for capturing midday surplus and dispatching it during evening peak.
Oversized Systems That Export at Half Retail. Battery Not Included in Proposal. Wrong Net Metering Explanation to Customers.
Rocky Mountain Power Interconnection. NEC 2020. All Salt Lake City AHJs.
Four Things That Define Solar in Salt Lake City.
Salt Lake City and All Surrounding Jurisdictions — Rocky Mountain Power Interconnection Formatted.
We cover Salt Lake County and all Salt Lake City metro jurisdictions. RMP Schedule 137 interconnection formatted.
| Jurisdiction | Utility | Permit Type | Key Notes | Review Time |
|---|---|---|---|---|
| Salt Lake City | Rocky Mountain Power | Bldg + Elec | SLC Building Services · $350–700 fee · 2–3 week review | 2–3 weeks |
| Salt Lake County (unincorp.) | Rocky Mountain Power | Bldg + Elec | SL County Building · Unincorporated areas | 2–4 weeks |
| West Valley City | Rocky Mountain Power | Bldg + Elec | City of West Valley Building · Own department · 2nd largest Utah city | 2–3 weeks |
| Sandy / Draper | Rocky Mountain Power | Bldg + Elec | South Salt Lake County · Own city building departments | 2–3 weeks |
| Murray / Midvale | Rocky Mountain Power | Bldg + Elec | Mid-county cities · Own building departments | 2–3 weeks |
| West Jordan / South Jordan | Rocky Mountain Power | Bldg + Elec | SW Salt Lake County · Fast-growing suburbs · Own departments | 2–3 weeks |
| Provo / Utah County | Rocky Mountain Power | Bldg + Elec | Utah County · Own city/county building depts · RMP territory | 2–4 weeks |
References: Rocky Mountain Power Solar · SLC Building Services
Solar Permit Package Salt Lake City — Salt Lake City Solar Permit Plan Sets. Rocky Mountain Power Ready.
Salt Lake City Plan Set — 24 Hours.
Rocky Mountain Power Interconnection · NEC 2020 · All Salt Lake City AHJs
Three Steps. 24 Hours. Salt Lake City AHJ Ready.
Licensed installers & EPCs only.