Sacramento Solar Permits.
SMUD 9.6¢. SolarApp+.
24 Hours.
Sacramento solar permit drawings and PE-stamped plan sets for City of Sacramento, Sacramento County, and all surrounding AHJs. SMUD Solar Storage Rate and PG&E NEM 3.0 interconnection documentation. SolarApp+ fast-track where available. Free for first-time clients.
SMUD Is Not on NEM 3.0. Sacramento Has Two Solar Economics Stories — and Your Customer's Address Determines Which One.
Most Sacramento solar content misrepresents SMUD as NEM 3.0. It is not. SMUD is a municipal utility governed by its own Board — not the CPUC. Verifying whether a Sacramento address is in SMUD or PG&E territory is the first step on every project.
SMUD vs PG&E Utility Confusion. SolarApp+ Qualification. A State Capital With Commercial Solar Opportunity.
Residential, Commercial, Battery, and EV Charger Plan Sets for Sacramento Installers.
Four Numbers That Drive Sacramento Solar Right Now.
Every Sacramento County Jurisdiction. Correct Utility. Correct Format.
Permit Design covers City of Sacramento, Sacramento County, and all surrounding cities. AHJ and utility confirmed per address before we build.
| Jurisdiction | Utility | Fast-Track | Key Notes | Review Time |
|---|---|---|---|---|
| City of Sacramento | SMUD | SolarApp+ | AB 2188 compliant · Same-day for qualifying systems · Community Development Department | Same day–2 wks |
| Unincorporated Sacramento County | SMUD / PG&E | SolarApp+ | County Building Division · East County often PG&E | Same day–3 wks |
| Elk Grove | SMUD | SolarApp+ | Fastest-growing Sacramento suburb · High residential solar volume | 1–2 weeks |
| Folsom | PG&E | SolarApp+ | PG&E NEM 3.0 · SGIP $150/kWh battery · Higher incomes drive battery attachment | 1–2 weeks |
| Rancho Cordova | PG&E | SolarApp+ | PG&E territory · Industrial commercial solar corridor near Mather Field | 1–2 weeks |
| West Sacramento / Davis | SMUD | SolarApp+ | SMUD SSR · UC Davis campus area commercial solar · Yolo County PDS for county territory | 1–3 weeks |
| Roseville / Rocklin | City of Roseville Electric | Manual | Roseville Electric is a separate municipal utility · Own NEM program · Confirm per address | 2–4 weeks |
| Citrus Heights / Fair Oaks | SMUD / PG&E | SolarApp+ | Mixed SMUD/PG&E boundary · Sacramento County permit jurisdiction | 1–3 weeks |
Also covered: Arden-Arcade, Carmichael, North Highlands, Foothill Farms, Antelope, Lincoln, Lodi, Galt, Woodland, and all Sacramento metro cities. References: SMUD Solar & Storage Rate · City of Sacramento Building Permits · DSIRE California
Sacramento Solar Permit Package — Solar Permit Plan Sets. PE-Stamped. SolarApp+ Ready. SMUD or PG&E Formatted.
Sacramento Plan Set — 24 Hours.
SMUD SSR + PG&E NEM 3.0 · SolarApp+ · All Sacramento County AHJs
Three Steps. 24 Hours. AHJ-Ready.
Licensed installers & EPCs only.