Home› Solar Permit Drawings› Kentucky Solar Permit Design
KY
🌾 Kentucky ✅ KRS 278.465 — Full Retail Net Metering Up to 30 kW

Kentucky
Solar Permit Plans.
NEC 2020. KRS 278.465 Full Retail Net Metering.
LG&E · KU · Property Tax Exempt.

Kentucky solar permit plan sets for licensed solar installers, EPCs, and roofing companies statewide. LG&E and KU offer full retail net metering for residential solar up to 30 kW under KRS 278.465. Kentucky property tax exemption permanently removes solar from tax assessment. Moderate cold climate: snow loads required. NEC 2020. AHJ-ready for all Kentucky jurisdictions.

NEC 2020 — KY Dept Housing BuildingsKRS 278.465 — Full Retail NEM ≤30 kWLG&E · KU · Duke Energy KYProperty Tax Exempt — KRS 132.020(2)(a)
NEC 2020KY Dept Housing Buildings — statewide
KRS 278.465Full retail NEM — ≤30 kW
Prop TaxExempt — KRS 132.020(2)(a)
LG&E · KUPPL Corp subsidiaries
NEC 2020Kentucky electrical code
KRS 278.465Full retail net metering
30 kWResidential NEM limit
Prop TaxExempt — permanent
LG&E · KUPPL Corp subsidiaries
✅
AHJ-ReadyNEC 2020 · Current codes
⚡
24–48 HrsResidential turnaround
🔄
Free RevisionsAHJ correction revisions
🌎
150+ PartnersInstallers, EPCs & roofers
Kentucky Solar Permits — 2026

LG&E and KU Serve Most of Kentucky With Full Retail Net Metering Under KRS 278.465. Kentucky Property Tax Exemption Is Permanent. Moderate Cold Climate: Snow Loads Required.

Permit Design builds Kentucky solar permit plan sets for licensed solar installers, EPCs, and roofing companies statewide. LG&E (also written LGE — Louisville Gas and Electric) and KU (Kentucky Utilities), both PPL Corporation subsidiaries, serve the majority of Kentucky including Louisville, Lexington, Frankfort, and surrounding areas. Both offer full retail net metering under KRS 278.465 for residential systems up to 30 kW and commercial systems up to 2 MW. Duke Energy Kentucky serves the Northern Kentucky corridor near Cincinnati.

Kentucky electrical code is NEC 2020. Structural codes are IBC 2018 and IRC 2018. Kentucky has moderate cold climate: ground snow loads of approximately 15 to 20 psf require ASCE 7 cold climate structural calculations. The property tax exemption (KRS 132.020(2)(a)) permanently removes solar system value from property tax assessment.

Permit Design also provides residential solar permit drawings, solar drafting services, pv permit plans, battery permit plans, and ev charger permit packages for Kentucky — all formatted for local AHJ and utility submission.

Kentucky's permitting landscape is shaped by its two primary investor-owned utilities — LG&E (Louisville Gas and Electric) and KU (Kentucky Utilities), both PPL Corporation subsidiaries — and the geographic complication of Duke Energy Kentucky in the Northern Kentucky corridor near Cincinnati. The utility per address determines which interconnection application is required under KRS 278.465. Submitting an LG&E form for a KU address, or a KU form for a Duke Energy Kentucky address in Boone County, results in rejection. We confirm utility per address before building every Kentucky plan set.

Kentucky building permits are administered at the city and county level. Louisville Metro Government (the 2003 merger of Louisville and Jefferson County) and Lexington-Fayette Urban County Government both operate consolidated permit offices that simplify the permitting process for Kentucky's two largest cities. Outside these consolidated governments, individual city and county building departments operate independently. Eastern Kentucky Appalachian counties — many with lower solar permit volumes — often have longer plan review timelines and may have less experience with utility-scale or battery storage plan sets. Permit Design formats every Kentucky plan set for the specific AHJ and utility combination confirmed per address.

Kentucky Net Metering — KRS 278.465

KRS 278.465 Requires LG&E and KU to Offer Full Retail Net Metering for Residential Solar Up to 30 kW. Northern Kentucky — Confirm Duke Energy Kentucky vs LG&E/KU Per Address.

Kentucky Net Metering Under KRS 278.465
✅Full retail 1:1 net metering for residential systems up to 30 kW
✅Commercial net metering available for systems up to 2 MW under KRS 278.465
✅LG&E net metering: Louisville and Jefferson County service territory
✅KU net metering: Lexington, Frankfort, central and eastern Kentucky
✅Submit LG&E or KU interconnection simultaneously with building permit
Northern Kentucky — Duke Energy Kentucky Territory
⚠️Boone, Kenton, Campbell counties (Covington, Newport, Florence) — Duke Energy Kentucky
⚠️Duke Energy Kentucky interconnection differs from LG&E/KU — confirm per address
✅Duke Energy Kentucky also offers net metering under Kentucky PSC rules
⚠️Jackson Purchase Energy (western KY TVA distributor) may have different program terms
✅We confirm utility per address and format every Kentucky plan set for the correct utility
Kentucky Solar Incentives — 2026

Kentucky Property Tax Exemption Is Permanent. KRS 278.465 Full Retail Net Metering. No State Income Tax Credit.

IncentiveStatusDetails
Kentucky Net Metering (KRS 278.465)✅ ActiveFull retail 1:1 net metering — residential ≤30 kW, commercial ≤2 MW. Required from LG&E, KU, Duke Energy KY.
Kentucky Property Tax Exemption✅ ActiveKRS 132.020(2)(a) — solar systems permanently exempt from property tax assessment
Kentucky State Income Tax Credit❌ NoneNo state solar income tax credit in Kentucky in 2026
Kentucky Sales Tax⚠️ AppliesSales tax generally applies to solar equipment — no general sales tax exemption
Federal Residential Tax Credit (25D)❌ ExpiredFederal 25D residential solar credit expired December 31, 2025
Kentucky Electrical + Structural Codes

NEC 2020. IBC/IRC 2018. Moderate Cold Climate: ~15–20 psf Snow Loads Statewide.

Electrical Code — NEC 2020
✅NEC 2020 — Kentucky Department of Housing, Buildings and Construction — statewide
✅Article 690 (Solar PV Systems) — all Kentucky solar
✅Article 706 (Energy Storage) — battery installations
✅Article 625 (EV Charging) — EV charger installations
⚠️Some Kentucky municipalities may have local code amendments — confirm AHJ per project
Structural — IBC/IRC 2018 + Moderate Cold Climate
⚠️Kentucky ground snow load: ~15–20 psf statewide (lower than Indiana or Michigan)
⚠️Eastern Kentucky Appalachian region: localized higher snow load values possible
✅IBC 2018 (commercial) and IRC 2018 (residential) — Kentucky structural standards
✅No PE stamp required for standard residential rooftop solar in Kentucky
✅Commercial and ground-mount projects require PE-stamped structural drawings
🏗️ Commercial Solar Permit — Kentucky

Also doing commercial rooftop, carport, or ground-mount in Kentucky?

Kentucky commercial solar permit plan sets reference IBC 2021 with NEC 2020 electrical throughout. KRS 278.465 requires LG&E, KU, and Duke Energy Kentucky to offer net metering for commercial systems up to 2 MW — a meaningful commercial incentive. Bourbon industry commercial solar: energy-intensive distillery and barrel warehousing operations create significant commercial rooftop demand. Engineering support for flat-roof ballasted arrays, bourbon facility rooftops, carport structures, and ground-mount installations statewide.

IBC 2021 — Kentucky Building CodeNEC 2020KRS 278.465 — Commercial NEM up to 2 MWBourbon Distillery Rooftop EngineeringLG&E · KU · Duke Energy KY Commercial
Commercial Quote →
Scope + turnaround quoted per project
Kentucky Solar Permitting — AHJ Landscape by Utility Territory

LG&E Serves Louisville. KU Serves Lexington and Central Kentucky. Duke Energy Kentucky Serves Northern Kentucky. Each Has Its Own Interconnection Process Under KRS 278.465.

Louisville Metro — LG&E Territory
🏙️Louisville Metro Government (merged Louisville city + Jefferson County since 2003) operates Louisville Metro Development Services as the single permit office for most Jefferson County addresses. One application process, one building department — a significant advantage over metros with fragmented city-county structures.
⚡LG&E (Louisville Gas and Electric) territory. KRS 278.465 full retail net metering — residential up to 30 kW, commercial up to 2 MW. LG&E interconnection application submitted simultaneously with building permit.
⚠️Independent cities within Jefferson County — St. Matthews, Shively, Jeffersontown, Lyndon, Anchorage — maintain separate building departments. Confirm city limits vs Louisville Metro jurisdiction per address.
⏱️Louisville Metro residential review: typically 5–10 business days. Commercial: 10–20 business days. Louisville Metro permit portal accepts digital submissions. LG&E interconnection: submit simultaneously for parallel processing.
💼Louisville commercial solar market: UPS Worldport (international air hub), Norton Healthcare, Baptist Health, Toyota Motor Manufacturing, and Ford's Louisville Assembly Complex create significant commercial rooftop solar demand in the LG&E territory.
Lexington-Fayette — KU Territory
🏙️Lexington-Fayette Urban County Government (merged city-county since 1974) operates the Division of Building Inspection, Permits and Licensing. One permit office for Fayette County — similar to Louisville Metro's consolidation benefit.
⚡KU (Kentucky Utilities) territory. KRS 278.465 full retail net metering. KU interconnection application submitted simultaneously with building permit. KU interconnection form differs from LG&E — confirm utility before building.
⏱️Lexington-Fayette residential review: typically 5–10 business days. University of Kentucky student-housing and off-campus residential market creates active solar demand in the KU territory.
📋Central and Eastern Kentucky — Frankfort, Richmond, Danville, Winchester, Berea — KU territory. Each has its own city or county building department. KU interconnection application consistent across the territory.
Northern Kentucky — Duke Energy Kentucky Territory
🏙️Boone County, Kenton County, and Campbell County — the Northern Kentucky corridor adjacent to Cincinnati — are Duke Energy Kentucky territory. Covington, Newport, Florence, Erlanger, Edgewood, and Fort Thomas are Duke Energy Kentucky addresses, not LG&E or KU.
⚡Duke Energy Kentucky interconnection application required — different from LG&E or KU. Duke Energy Kentucky offers net metering under Kentucky PSC rules consistent with KRS 278.465. Submitting LG&E or KU forms for Northern Kentucky addresses results in rejection.
⏱️Each Northern Kentucky city operates its own building department: Covington, Newport, Florence, and Erlanger each have separate permit processes. Kenton County and Boone County handle unincorporated area permits. Plan review: typically 7–15 business days.
⚠️Jackson Purchase Energy (owned by TVA) serves western Kentucky including Paducah, Mayfield, and Murray. Jackson Purchase Energy interconnection and program terms may differ from LG&E, KU, or Duke Energy Kentucky — confirm per address for western Kentucky projects.
Bourbon Country + Eastern Kentucky
🥃Kentucky's bourbon distillery corridor — Bardstown (Nelson County), Elizabethtown (Hardin County), Lawrenceburg (Anderson County), Frankfort (Franklin County) — is LG&E or KU territory with strong commercial solar demand from the energy-intensive distillery and barrel warehousing operations.
⏱️Rural Kentucky county building offices process fewer solar permits annually — plan review in rural counties can take 15–25 business days and may require more installer communication than urban AHJs.
❄️Eastern Kentucky Appalachian region: localized higher snow load values possible, particularly at elevation in counties like Letcher, Pike, Harlan, and Bell. Confirm ASCE 7 snow load per address for eastern Kentucky mountain-adjacent projects.
📋Big Sandy Electric Cooperative and other rural cooperatives serve some eastern Kentucky areas. Cooperative interconnection applications differ from LG&E, KU, and Duke Energy Kentucky — confirm utility per address before building.
Kentucky Solar Permit + Interconnection Timeline

Typical Kentucky Residential Solar Permit: 3 to 6 Weeks From Plan Set to Permission to Operate. Utility Determines Interconnection Application.

1
Order Plan Set (Day 0)
Submit project details. We confirm AHJ and utility per address — LG&E, KU, Duke Energy Kentucky, or Jackson Purchase Energy. Kentucky cold climate snow load confirmed. Residential plan sets delivered in 24–48 hours. Commercial: 3–5 business days.
2
Submit Permit + Interconnection (Day 1–2)
Building permit submitted to AHJ with complete plan set. Correct KRS 278.465 interconnection application submitted simultaneously. Louisville Metro and Lexington-Fayette accept digital submissions. Northern Kentucky city departments and rural county offices vary in digital capability.
3
Permit Approval (Day 5–20)
Louisville Metro and Lexington-Fayette: 5–10 business days. Northern Kentucky cities: 7–15 business days. Rural county offices: 15–25 business days. Utility KRS 278.465 interconnection approval runs parallel: LG&E and KU typically 2–4 weeks; Duke Energy Kentucky similar.
4
Installation (Week 2–5)
Installation after permit approval. Kentucky moderate cold climate: winter installations require attention to ice and cold-weather racking procedures. Spring through fall peak installation season. Battery system commissioning straightforward in Kentucky moderate climate.
5
Inspection + PTO (Week 3–6)
Final building inspection after installation. Inspection wait: 2–5 business days in Louisville Metro and Lexington, longer in rural counties. Utility PTO (LG&E, KU, Duke Energy KY): 5–15 business days after inspection docs submitted.
6
KRS 278.465 NEM Billing Begins
Full retail 1:1 net metering activates on PTO. Every kWh exported earns a full retail rate credit. Monthly credits roll forward. Kentucky property tax exemption (KRS 132.020(2)(a)) applies automatically — no annual filing required.
⚠️ Common Kentucky permit delay causes: Wrong utility interconnection application (LG&E form for KU address, or LG&E/KU for Northern Kentucky Duke Energy Kentucky address), missing ASCE 7 cold climate snow load calcs in structural section, and Eastern Kentucky rural AHJ timelines not accounted for in project scheduling.
Kentucky Solar Permit Plan Set — 7 Sheets

Every Kentucky Plan Set: 7 Sheets. NEC 2020. LG&E / KU Interconnection. KRS 278.465 Net Metering. Property Tax Exempt Note.

01
Cover + Site Plan
Project info, address, AHJ, LG&E / KU interconnection. Setbacks. System specs.
02
System Single Line
NEC 2020 Article 690 SLD. PV circuits, inverter, AC disconnect, utility meter, panel. Battery Article 706 where included.
03
Array Layout
Roof plan with panel layout, string config, roof slopes, setbacks, fire access paths per AHJ.
04
Structural Details
Racking attachment. ASCE 7 cold climate calcs — ~15–20 psf Kentucky snow load. IRC 2018 (residential) or IBC 2018 (commercial).
05
Equipment Specs
Cut sheets for panels, inverter, racking, disconnects. Battery specs where included.
06
Load Calculations
NEC 2020 load calcs. Panel capacity verification. Battery permit plans and EV charger permit packages included where specified.
07
Interconnection Package
LG&E, KU, or Duke Energy Kentucky interconnection — formatted per utility confirmed at address. KRS 278.465 net metering documentation.
1
Submit Project Details
Address, specs, equipment. We confirm AHJ and LG&E / KU interconnection. Kentucky utility confirmed per address — LG&E, KU, or Duke Energy Kentucky.
2
We Build the Plan Set
NEC 2020 for Kentucky. LG&E or KU interconnection. KRS 278.465 net metering documentation. Property tax exemption note.
3
Submit Permit + Interconnection
Ready-to-submit for Kentucky AHJ and LG&E / KU interconnection. Free revisions for any AHJ correction on our design.
🛡️

The Permit Design Commitment — Every Kentucky Project

What every solar installer, EPC, and roofing company can expect on every Kentucky plan set we deliver.

✅ 24–48 Hour Turnaround on Standard Kentucky Residential Solar Projects
✅ No-Cost Revisions for AHJ Corrections Related to Our Design
✅ Kentucky-Specific Code Compliance — NEC 2020, Utility Interconnection, Local AHJ Requirements
✅ Solar Permit Drawings and Support Through Permit Approval — We Don't Disappear After Delivery
✅ First Plan Set Free for New Kentucky Installer Partners — No Commitment Required
FAQ — Kentucky Solar

Kentucky Solar Permit Design — Installer FAQ

What utilities serve Kentucky for solar?+

LG&E (Louisville Gas and Electric) and KU (Kentucky Utilities), both PPL Corporation subsidiaries, serve the majority of Kentucky. LG&E covers Louisville and Jefferson County. KU covers Lexington-Fayette, Frankfort, and most of central and eastern Kentucky. Duke Energy Kentucky serves the Northern Kentucky corridor — Boone County, Kenton County, and Campbell County (Covington, Newport, Florence, Erlanger) — adjacent to Cincinnati. This is the most common utility confusion in Kentucky: Northern Kentucky addresses that feel geographically close to Louisville are actually Duke Energy Kentucky territory, not LG&E. Jackson Purchase Energy (a TVA power distributor) serves western Kentucky including Paducah, Mayfield, and Murray. Big Sandy Electric Cooperative and other rural cooperatives serve Appalachian eastern Kentucky. The utility per address is critical — submitting an LG&E interconnection application for a Duke Energy Kentucky address results in rejection. We confirm utility per address before building every Kentucky plan set.

Does Kentucky have net metering?+

Yes. Kentucky net metering is governed by KRS 278.465, which requires investor-owned utilities — LG&E, KU, and Duke Energy Kentucky — to offer net metering for residential solar systems up to 30 kW and commercial systems up to 2 MW. Net metering credits every exported kilowatt-hour at the full retail electricity rate, making it a genuine 1:1 net metering market. Monthly excess credits roll forward to the following month's bill. LG&E and KU both offer full retail net metering under this statute, as does Duke Energy Kentucky for Northern Kentucky customers. Kentucky's net metering program is more financially favorable than Alabama's avoided cost program, Tennessee's TVA Dispersed Power Generation program, or Mississippi's limited DG programs — all of which pay below-retail rates for exports. Rural Kentucky cooperative customers should confirm net metering terms with their specific cooperative, as cooperative programs may differ from investor-owned utility programs under KRS 278.465. Kentucky PSC oversees compliance.

What Kentucky solar incentives apply in 2026?+

Kentucky net metering (KRS 278.465) — full retail rate for residential systems up to 30 kW. Kentucky property tax exemption (KRS 132.020(2)(a)). No state solar income tax credit in Kentucky in 2026. Sales tax generally applies to solar equipment. Federal 25D residential credit expired December 31, 2025.

What is Kentucky's property tax exemption for solar?+

KRS 132.020(2)(a) permanently exempts solar energy systems from property tax assessment in Kentucky — a full exemption, not a partial deduction like Indiana's IC § 6-1.1-12-26.1. A solar installation that increases a home's assessed value by $20,000 pays zero additional property taxes on that increment, every year, for the full life of the system. At Kentucky's effective property tax rate of approximately 0.65%, the exemption saves approximately $130 per year — or $3,250 over a 25-year system life. The exemption applies automatically to qualifying residential and commercial solar installations with no annual filing or renewal required. Kentucky has no state solar income tax credit in 2026 and sales tax generally applies to solar equipment purchases, making the property tax exemption the only ongoing state-level financial incentive. This permanent, automatic, no-application-required exemption is particularly valuable for long-hold property owners and commercial real estate investors evaluating rooftop solar.

What electrical code does Kentucky use in 2026?+

NEC 2020 under the Kentucky Building Code, administered by the Kentucky Department of Housing, Buildings and Construction (KY DHBC). Kentucky adopted NEC 2020 statewide for all electrical installations including solar PV systems. Article 690 governs Kentucky solar PV system design — including rapid shutdown (§690.12), array wiring, inverter disconnects, and system labeling. Article 706 governs energy storage systems. Article 625 governs EV charging equipment. Some Kentucky municipalities maintain local amendments to the base NEC 2020 adoption. IBC 2018 and IRC 2018 are the current Kentucky structural codes. Kentucky has not adopted NEC 2023 as of 2026. Confirm any local amendments with the specific AHJ — particularly for Louisville Metro and Lexington-Fayette which have active building code programs.

Are snow loads required for Kentucky solar plan sets?+

Yes — ASCE 7 cold climate structural calculations are required in every Kentucky solar plan set structural section. Kentucky ground snow loads are approximately 15 to 20 psf across most of the state — moderate by Midwest standards but significant compared to Sun Belt markets where snow loading is zero. Eastern Kentucky Appalachian counties at elevation — Letcher, Pike, Harlan, Bell, and surrounding mountain counties — may see localized ground snow loads of 20 to 30 psf. Confirm ASCE 7 values per address for eastern Kentucky mountain-adjacent projects. Kentucky's snow loads are lower than Indiana (20 to 25 psf statewide) and significantly lower than Michigan or Wisconsin, but they are not negligible and must be included in the structural section. Kentucky AHJs — Louisville Metro Development Services, Lexington-Fayette, and most county building offices — review structural sections for cold climate compliance. Plan sets submitted without Kentucky-specific ASCE 7 snow loading in the structural section fail plan review and require resubmission. Kentucky's mild winters also allow year-round solar installation in most of the state.

Does Kentucky require a PE stamp for residential solar?+

Kentucky has no statewide PE stamp requirement for standard residential rooftop solar installations. Louisville Metro, Lexington-Fayette, Northern Kentucky municipalities, and most Kentucky county building departments do not require a PE stamp for standard residential rooftop solar plan sets under approximately 30 kW. Commercial solar installations require PE-stamped structural drawings. Ground-mount systems of all sizes require PE-stamped structural engineering for the foundation and racking design. Bourbon industry commercial rooftop solar — warehouse and distillery rooftops — frequently require PE stamps due to unusual roof loading conditions from barrel storage. Eastern Kentucky rural county building departments may occasionally request PE stamps for residential systems due to unfamiliarity with solar plan sets — confirm per AHJ before ordering. Permit Design coordinates PE stamp services for Kentucky commercial projects upon request.

How quickly can you deliver a Kentucky solar permit plan set?+

Most Kentucky residential solar permit plan sets are delivered in 24 to 48 hours from project submission. Battery storage plan sets ship same day when ordered with the solar plan set. Commercial solar plan sets: 3 to 5 business days depending on system complexity and utility territory. EV charger permit plan sets: 24 to 48 hours. All Kentucky residential plan sets include the correct utility interconnection package per address (LG&E, KU, Duke Energy Kentucky, or Jackson Purchase Energy), KRS 278.465 net metering documentation, NEC 2020 Article 690 single-line diagram, ASCE 7 cold climate snow load calcs, structural calculations, and all 7 plan set sheets. Rush delivery available — contact us before ordering to confirm turnaround for your deadline.

Kentucky Solar Market

Kentucky Is a Full Retail Net Metering Market. Bourbon State Commercial Solar Growing. Moderate Cold Climate With Snow Load Requirements.

KRS 278.465
Full Retail Net Metering — Required by Law
Kentucky KRS 278.465 requires LG&E, KU, and Duke Energy Kentucky to offer full retail 1:1 net metering for residential solar up to 30 kW and commercial up to 2 MW. Every exported kWh earns a full retail rate credit. Kentucky is a genuine net metering market.
KRS 132.020
Kentucky Property Tax Exemption — Permanent
KRS 132.020(2)(a) permanently exempts solar energy systems from property tax assessment. With no state income tax credit, the property tax exemption is the primary ongoing state-level financial incentive for Kentucky solar customers.
Bourbon Country
Kentucky Commercial Solar — Bourbon, Healthcare, Logistics
Kentucky's bourbon distillery corridor, healthcare sector, UPS Worldport hub in Louisville, and Toyota manufacturing in Georgetown create meaningful commercial solar demand with large roof areas and energy-intensive operations.
Louisville Metro
Louisville Metro Consolidated Government — Simpler AHJ
The 2003 merger of Louisville and Jefferson County created Louisville Metro Government — one building department for most Jefferson County addresses. Lexington-Fayette also has a consolidated urban county government, simplifying permitting for Kentucky's two largest cities.
🎁 Free First Plan Set

New to Permit Design? Your First Kentucky Solar Permit Plan Set Is on Us.

Try our Kentucky plan sets with zero upfront commitment. Permit Design works exclusively with licensed solar installers, EPC companies, and roofing companies. Here's what you get on your first project:

✅ Complete Kentucky residential solar plan set — all 7 sheets, NEC 2020 formatted
✅ LG&E · KU · Duke Energy Kentucky interconnection application package formatted for your address
✅ ASCE 7 structural calcs specific to your Kentucky project location
✅ Free revisions if your AHJ requests any correction on our design
✅ 24–48 hour turnaround from project submission to plan set delivery

Mention "free trial" in your order notes. One free residential plan set per new partner account. Available exclusively to licensed solar installers, EPC companies, and roofing companies that perform solar installation.

Permit Design builds Kentucky solar permit plan sets for licensed solar installers, EPCs, and roofing companies statewide. First plan set free for new installer partners. LG&E, KU, or Duke Energy Kentucky interconnection formatted per address. KRS 278.465 net metering documentation. NEC 2020. Battery plan sets available.

Residential solar permit drawings, solar drafting services, battery permit plans, ev charger permit packages, and pv permit plans all available for Kentucky. Solar drafting services, pv permit plans, battery permit plans, ev charger permit packages, and residential solar permit drawings also available for Kentucky. Utility confirmed per address — LG&E, KU, Duke Energy Kentucky, or Jackson Purchase Energy — before every Kentucky plan set build. KRS 278.465 net metering documentation included in all Kentucky residential plan sets. Property tax exemption note (KRS 132.020(2)(a)) included at no additional charge.

Solar Permit Plan Sets — Ohio Valley & Southeast States

Kentucky Solar Installers Often Serve Indiana, Ohio, Tennessee, and Virginia. Permit Design Builds Plan Sets for All Ohio Valley States — With Each State's Utility Programs, Codes, and Incentives.

Three Utilities: AES Indiana, Duke Energy Indiana, NIPSCO
Indiana has three primary investor-owned utilities serving different geographic territories — a complexity Kentucky installers expanding north should plan for. AES Indiana serves Indianapolis. Duke Energy Indiana serves southern and western Indiana. NIPSCO serves the northern Indiana corridor from South Bend to Gary. Each utility has its own interconnection application under IURC oversight. Cold climate: 20 to 25 psf snow loads statewide. Indiana offers a property tax deduction for solar (IC § 6-1.1-12-26.1) and a sales tax exemption on solar equipment. Permit Design builds Indiana solar permit plan sets including Indianapolis. View Indiana page →
AEP Ohio + Ohio Edison + Duke Energy Ohio — Northern KY Neighbor
Ohio net metering is available from AEP Ohio (Columbus and southern Ohio), Ohio Edison/FirstEnergy (northeast Ohio), and Duke Energy Ohio (Cincinnati, which borders Northern Kentucky's Duke Energy Kentucky territory). Ohio cold climate: 20 to 30 psf ground snow loads, higher in the Lake Erie snowbelt. Ohio has a property tax exemption for solar under ORC § 5709.53 and a sales tax exemption. Duke Energy Ohio and Duke Energy Kentucky share interconnection process similarity that can benefit Northern Kentucky and Cincinnati-area installers. Permit Design builds Ohio solar permit plan sets including Columbus, Cleveland, and Cincinnati. View Ohio page →
TVA Dispersed Power Generation — Adjacent Southern Market
Tennessee is served by the Tennessee Valley Authority (TVA) power system statewide through local power distributors (LPDs). TVA's Dispersed Power Generation (DPG) program compensates solar customers at the avoided cost rate — not retail net metering — making self-consumption optimization the strategic priority in Tennessee. Tennessee has no mandatory statewide net metering. No state income tax on earned income (until 2022 full phase-out). Tennessee solar production is solid at 4.8 to 5.2 peak sun hours. Permit Design builds Tennessee solar permit plan sets including Nashville, Memphis, Knoxville, and Chattanooga. View Tennessee page →
Dominion Energy Virginia — Full Retail Net Metering
Virginia has full retail net metering under the Virginia Clean Economy Act. Dominion Energy Virginia serves most of the state including Richmond, Northern Virginia, and the Hampton Roads corridor. Appalachian Power (AEP) serves western Virginia bordering Kentucky. Virginia has a solar property tax exemption for residential systems and a sales tax exemption on solar equipment. Virginia's solar market has grown rapidly due to the VCEA's renewable energy mandates driving commercial and utility-scale demand. Permit Design builds Virginia solar permit plan sets including Virginia Beach and Richmond. View Virginia page →
Common Plan Set Issues — Kentucky

Top 4 Reasons Kentucky Solar Permits Get Rejected. Every One of These Is Avoidable With a Correct Plan Set.

These are the most common reasons Kentucky solar permit applications are rejected or delayed at plan review — and the reason Permit Design built Kentucky-specific knowledge into every plan set we produce. Every plan set we deliver for Kentucky addresses all four of these issues before submission.

❌Wrong utility interconnection application — LG&E form submitted for a KU address, KU form submitted for a Duke Energy Kentucky (Northern Kentucky) address, or LG&E/KU form submitted for a Jackson Purchase Energy (western Kentucky) address. Each utility has a separate KRS 278.465 interconnection application.
❌Missing ASCE 7 cold climate snow load calcs — Kentucky plan sets require cold climate structural calculations for ~15 to 20 psf ground snow loads. Eastern Kentucky Appalachian addresses may see higher localized values requiring specific ASCE 7 lookup.
❌Northern Kentucky utility confusion — Boone, Kenton, and Campbell counties (Covington, Newport, Florence, Erlanger) are Duke Energy Kentucky territory, not LG&E or KU despite being adjacent to the Louisville/Lexington service areas. Using the LG&E or KU application for Northern Kentucky addresses results in rejection.
❌Battery storage plan set without complete NEC 2020 Article 706 documentation — Kentucky AHJs require full battery permit plans. The Article 706 compliance section must include battery energy storage system specifications, disconnect requirements, and load integration calculations.
🔄 Permit Design's free revision guarantee covers any AHJ-requested correction on our design. If a Kentucky AHJ requests a correction on something we designed — the single-line diagram, structural calculations, or interconnection package format — we revise at no charge. Our Kentucky-specific knowledge means these corrections are rare, but the guarantee means the risk is ours, not yours.

Kentucky Plan Set Guarantee

Every Kentucky plan set is NEC 2020 formatted — LG&E or KU interconnection, KRS 278.465 net metering docs, property tax exemption note, ASCE 7 snow load calcs. Free revisions for any AHJ correction. 24–48 hr turnaround.

Order Now →
AHJ-ReadyBuilt to current code
150+Installer partners
50 StatesAll US states covered
Res & CommProject types covered
Free TrialFirst plan set on us
Sources + Last Reviewed

Last updated: July 2026. Plan sets reviewed by licensed professional engineer for Kentucky structural and electrical compliance.

LG&E and KU (PPL Corporation) full retail NEM (KRS 278.465, residential ≤30 kW) confirmed from KPSC. Property tax exemption (KRS 132.020(2)(a)) confirmed. NEC 2020 Kentucky adoption confirmed. IBC/IRC 2018 confirmed. ASCE 7 Kentucky snow loads (~15–20 psf) confirmed. Duke Energy Kentucky Northern KY territory confirmed. Federal 25D expiration confirmed. Last reviewed July 2026.

NEC 2020KRS 278.465 Net MeteringLG&EKU Kentucky UtilitiesProperty Tax ExemptSolar Drafting Services KentuckyResidential Solar Permit KentuckyBattery Permit Plans KentuckyEV Charger Permit KentuckyPV Permit Plans KentuckyKentucky Solar Permit DrawingsKentucky Solar CAD ServicesJuly 2026