Riverside Solar
Permit Design.
RPU Isn't on
NEM 3.0. Know That.
Riverside solar permit drawings and PE-stamped plan sets for every Riverside County AHJ. The City of Riverside runs its own municipal utility — RPU — which is not on CPUC NEM 3.0. Most national installers don't know this and quote the wrong economics. SolarApp+ fast-track, battery and EV charger plan sets included. Free for first-time clients.
The City of Riverside Has Its Own Utility. RPU Isn't Subject to NEM 3.0. This Changes the Customer Conversation Completely.
Most installers coming to Riverside from LA or San Diego assume it's SCE territory and quote NEM 3.0 economics. For City of Riverside customers, that's wrong. Riverside Public Utilities (RPU) operates outside the CPUC and has its own solar export program under Electric Rule 22. Step outside the city limits into unincorporated Riverside County or a city like Moreno Valley, and you're back on SCE — NEM 3.0 applies. We sort this out per address, every time.
Wrong Utility. Wrong Economics. Wrong Interconnection. Three Ways Installers Trip Up on Riverside Solar.
Every Job Type. RPU and SCE Both Covered. All Riverside County AHJs.
Four Numbers That Drive Solar in the Inland Empire.
Every Riverside County Jurisdiction. RPU or SCE Confirmed. Right Format Every Time.
We cover City of Riverside, unincorporated County, and all surrounding Inland Empire cities. Utility confirmed per address before we build.
| Jurisdiction | Utility | Fast-Track | Key Notes | Review Time |
|---|---|---|---|---|
| City of Riverside | RPU | SolarApp+ | RPU Electric Rule 22 · ~9¢/kWh export · Not NEM 3.0 · CEDD portal | Same day–2 wks |
| Moreno Valley | SCE | Manual | SCE NEM 3.0 · SGIP $150/kWh · Fastest-growing IE city · High residential volume | 2–4 weeks |
| Corona | SCE | Manual | SCE NEM 3.0 · SGIP eligible · Mix of residential and commercial | 2–3 weeks |
| Temecula / Murrieta | SCE | Manual | SCE NEM 3.0 · South Riverside County · Strong battery attachment | 2–3 weeks |
| Palm Springs / Coachella Valley | SCE | Manual | Extreme desert heat · ASCE 7 wind Exposure C · Tourism/hospitality commercial solar | 2–4 weeks |
| Jurupa Valley / Norco | SCE | Manual | Adjacent to Riverside city but SCE territory · Confirm per address | 2–3 weeks |
| Hemet / San Jacinto | SCE | Manual | Inland Valley · SCE NEM 3.0 · Rural residential and small commercial | 2–4 weeks |
Also covered: Lake Elsinore, Wildomar, Menifee, Perris, Beaumont, Banning, Desert Hot Springs, and all Riverside County cities. References: RPU Solar Program · SCE NEM 3.0 · DSIRE California
Solar Permit Package Riverside — Riverside Solar Permit Plan Sets. PE-Stamped.
Riverside Plan Set — 24 Hours.
RPU + SCE covered · SolarApp+ · SGIP for SCE · All Riverside County AHJs
Three Steps. 24 Hours. Right Utility Every Time.
Licensed installers & EPCs only.