Richmond Solar
Permit Design.
Dominion Energy Virginia Net Metering.
Richmond City ≠ Henrico ≠ Chesterfield · Three Separate AHJs.
Richmond solar permit drawings for Richmond City and surrounding counties. Dominion Energy Virginia net metering at full retail rate. Richmond is an independent Virginia city — completely separate from Henrico County, Chesterfield County, and Hanover County, each with its own building department. Wrong jurisdiction = immediate rejection. Virginia net metering protected by SCC. NEC 2020. Free for first-time clients.
Richmond City Is an Independent Virginia City — Not Part of Henrico or Chesterfield County. Three Completely Separate Building Departments. Routing to the Wrong One Results in Immediate Rejection.
Dominion Energy Virginia serves Richmond and surrounding counties with net metering at the full retail rate under Virginia SCC regulations. Richmond City is an independent city in Virginia — legally and structurally separate from Henrico County to the north and east, Chesterfield County to the south, and Hanover County to the north. Each has its own building department: Richmond City Building Inspections, Henrico County Building, Chesterfield County Building, and Hanover County Building. Routing a Henrico address to Richmond City Building results in immediate rejection. We confirm AHJ per address before building every Richmond plan set.
City vs County AHJ Confusion. Dominion Application Not Formatted. REC Cooperative Territory Missed.
Dominion Energy VA Interconnection. NEC 2020. All Richmond AHJs.
Four Things That Define Solar in Richmond.
Richmond and All Surrounding Jurisdictions — Dominion Energy VA Interconnection Formatted.
We cover Richmond City, Henrico County, Chesterfield County, and all Richmond metro AHJs. Dominion interconnection formatted.
| Jurisdiction | Utility | Permit Type | Key Notes | Review Time |
|---|---|---|---|---|
| Richmond City | Dominion Energy VA | Bldg + Elec | Richmond City Building Inspections · City limits only · 2–4 week review | 2–4 weeks |
| Henrico County | Dominion Energy VA | County Bldg + Elec | Henrico County Building · N./E. of Richmond City · Own dept | 2–3 weeks |
| Chesterfield County | Dominion Energy VA | County Bldg + Elec | Chesterfield County Building · S. of Richmond City · Own dept | 2–3 weeks |
| Hanover County | Dominion / REC | County Bldg + Elec | Hanover County Building · N. of Richmond · Confirm utility per address | 2–4 weeks |
| Colonial Heights / Hopewell | Dominion Energy VA | Bldg + Elec | Own city building depts · Independent cities S. of Richmond | 2–3 weeks |
| Goochland / Powhatan County | Dominion / REC | County Bldg + Elec | County building depts · W. Richmond metro · Confirm utility | 2–4 weeks |
| Ashland (Hanover County) | Dominion / REC | Bldg + Elec | Town of Ashland Building · N. Richmond corridor · Confirm utility | 2–3 weeks |
References: Dominion Energy VA Net Metering · Richmond City Building
Solar Permit Package Richmond — Richmond Solar Permit Plan Sets. Dominion Energy VA Ready.
Richmond Plan Set — 24 Hours.
Dominion Energy VA Interconnection · NEC 2020 · All Richmond AHJs
Three Steps. 24 Hours. Richmond AHJ Ready.
Licensed installers & EPCs only.