St. Louis Solar
Permit Design.
Ameren Missouri Net Metering.
City ≠ County AHJ · Metro East IL Side Too.
St. Louis solar permit drawings for St. Louis City, St. Louis County, and Metro East. Key distinction: St. Louis City and St. Louis County are completely separate jurisdictions. Ameren Missouri net metering at retail rate. Metro East (Belleville, O'Fallon) is Ameren Illinois with different state rules. NEC 2020. Missouri property tax exemption. Free for first-time clients.
St. Louis City and St. Louis County Are Completely Separate Jurisdictions. Metro East Is Illinois. Ameren Missouri and Ameren Illinois Are Different Companies. Confirm Per Address Before You Build.
Ameren Missouri serves St. Louis City, St. Louis County, and most of Missouri with net metering at the full retail rate, as required by Missouri law. St. Louis City is an independent city in Missouri — it is not part of St. Louis County, an unusual legal structure that creates two completely separate building jurisdictions in the same metro. Metro East (Belleville, O'Fallon, Edwardsville, Alton on the Illinois side of the Mississippi) is Ameren Illinois territory with different state regulatory requirements, different net metering rules, and different AHJs. We confirm the state side, utility, and AHJ per address before building every St. Louis plan set.
City vs County AHJ Confusion. Metro East IL Side Missed. Ameren MO vs IL Mix-Up.
Ameren Missouri Interconnection. NEC 2020. All St. Louis AHJs.
Four Things That Define Solar in St. Louis.
St. Louis and All Surrounding Jurisdictions — Ameren Missouri Interconnection Formatted.
We cover St. Louis City, St. Louis County, and Metro East. Ameren MO or IL confirmed per address.
| Jurisdiction | Utility | Permit Type | Key Notes | Review Time |
|---|---|---|---|---|
| St. Louis City | Ameren Missouri | Bldg + Elec | St. Louis City Building Division · Independent city · 3–5 week review | 3–5 weeks |
| St. Louis County (unincorp.) | Ameren Missouri | County Bldg + Elec | St. Louis County Building · Unincorporated county areas | 2–4 weeks |
| Clayton / Kirkwood | Ameren Missouri | Bldg + Elec | Own city building depts · St. Louis County incorporated cities | 2–3 weeks |
| Chesterfield / Ballwin | Ameren Missouri | Bldg + Elec | Own city building depts · W. St. Louis County · Growing market | 2–3 weeks |
| Webster Groves / Ladue | Ameren Missouri | Bldg + Elec | Own city building depts · Historic inner-ring suburbs | 2–3 weeks |
| Belleville / O'Fallon (IL) | Ameren Illinois | Bldg + Elec | IL building depts · Metro East · IL rules · Confirm utility | 2–4 weeks |
| Edwardsville / Alton (IL) | Ameren Illinois | Bldg + Elec | IL building depts · Northern Metro East · Madison County IL | 2–4 weeks |
References: Ameren Missouri Solar · St. Louis City Building
Solar Permit Package St. Louis — St. Louis Solar Permit Plan Sets. Ameren Missouri Ready.
St. Louis Plan Set — 24 Hours.
Ameren Missouri Interconnection · NEC 2020 · All St. Louis AHJs
Three Steps. 24 Hours. St. Louis AHJ Ready.
Licensed installers & EPCs only.