Atlanta Solar
Permit Design.
Georgia Power Net Metering.
Multiple Metro AHJs · Confirmed Per Address.
Atlanta solar permit drawings for City of Atlanta and all metro county AHJs. Georgia Power net metering for residential solar under 10 kW, crediting exports at the full retail rate. Atlanta spans Fulton, DeKalb, Gwinnett, Cobb, and Cherokee counties — each with its own building department. NEC 2020. Georgia 100% property tax exemption. Free for first-time clients.
Georgia Power Net Metering for Residential Solar Under 10 kW. Atlanta Metro Spans Many Counties — Each With Its Own Building Department. AHJ Confirmed Before You Build.
Georgia Power (a Southern Company subsidiary) serves most of metro Atlanta with net metering for residential systems under 10 kW — crediting exports at the full retail electricity rate with monthly rollover. The Atlanta metro spans Fulton, DeKalb, Gwinnett, Cobb, and Cherokee counties, each with a separate building department. City of Atlanta Building covers only addresses within city limits. Some outer areas — particularly Cherokee and Forsyth — are served by EMC cooperatives rather than Georgia Power. We confirm the AHJ and utility per address before building every Atlanta plan set.
Wrong Building Department. EMC Territory Missed. Georgia Power 10 kW Cap Not Flagged.
Georgia Power Interconnection. NEC 2020. All Atlanta AHJs.
Four Things That Define Solar in Atlanta.
Atlanta and All Surrounding Jurisdictions — Georgia Power Interconnection Formatted.
We cover City of Atlanta, Fulton, DeKalb, Gwinnett, Cobb, and all Atlanta metro jurisdictions. AHJ confirmed per address.
| Jurisdiction | Utility | Permit Type | Key Notes | Review Time |
|---|---|---|---|---|
| City of Atlanta | Georgia Power | Bldg + Elec | Atlanta Office of Buildings · City-limit addresses only · 2–4 week review | 2–4 weeks |
| Fulton County (unincorp.) | Georgia Power | County Bldg + Elec | Fulton County Building · Areas outside city limits | 2–4 weeks |
| DeKalb County / Decatur | Georgia Power | Bldg + Elec | DeKalb County Building · Decatur own dept · Confirm per address | 2–4 weeks |
| Gwinnett County | Georgia Power | County Bldg + Elec | Gwinnett County Building Inspections · NE suburb | 2–3 weeks |
| Cobb County / Marietta | Georgia Power | Bldg + Elec | Cobb County Building · Marietta own dept | 2–3 weeks |
| Sandy Springs / Alpharetta | Georgia Power | Bldg + Elec | Own city building depts · Fulton County incorporated cities | 2–3 weeks |
| Cherokee County | Georgia Power / EMC | County Bldg + Elec | Cherokee County Building · Confirm utility per address | 2–4 weeks |
References: Georgia Power Solar · City of Atlanta Building
Solar Permit Package Atlanta — Atlanta Solar Permit Plan Sets. Georgia Power Ready.
Atlanta Plan Set — 24 Hours.
Georgia Power Interconnection · NEC 2020 · All Atlanta AHJs
Three Steps. 24 Hours. Atlanta AHJ Ready.
Licensed installers & EPCs only.